Laserfiche WebLink
7.D. - Page 48 of 126 <br />City of Redwood City <br />Mixed -Use Live/Work and Emergency Shelter Zoning Amendment Project <br />Impact 4.8-5: The General Plan allows for new development Less than <br />within designated FEMA flood hazard areas, as well as the significant <br />Emerald Lake dam inundation area, which could increase flood <br />hazards within the plan area. <br />Impact 4.8-6: Due to the proximity of the plan area to the San <br />Less than <br />Francisco Bay, development allowed by the General Plan could <br />significant <br />be located in an area of potential inundation by seismic -related <br />result of the proposed <br />seiche. <br />project. <br />Impact 4.8-7: Due to the sloping topography of the hillside <br />Less than <br />areas within the western and southern portions of the plan <br />significant <br />area, development allowed by the General Plan could be <br />in circumstances that would affect the environment. <br />located in an area of potential inundation by seismic -related <br />mudflow. <br />Land Use <br />Impact 4.9-1: The General Plan would continue existing Beneficial <br />development patterns by focusing new development in largely <br />urbanized infill areas and major transportation corridors. It <br />would improve connectivity among the various areas of the City <br />through enhanced bicycle, pedestrian, and transit access, <br />fostering connectivity through neighborhoods and blocks. <br />Noise <br />The proposed project involves a zoning ordinance amendment <br />affecting only the MULW zoning district. As discussed in Section <br />2, Project Description, and throughout this addendum, the <br />changes associated with the proposed project would occur in <br />already developed areas of Redwood City zoned for more intense <br />development and would not result in a significant increase in lot <br />coverage. Therefore, the proposed project would not exacerbate <br />flood risk or risks posed by seismic -related seiche or mudflow. <br />Similar to the conclusions in <br />the General Plan EIR, the <br />proposed project would <br />result in less than significant <br />impacts from flooding, <br />seiche, or mudflows. No <br />new or more severe <br />impacts would occur. <br />Impacts would be within <br />the scope of those <br />identified in the General <br />Plan EIR. <br />The proposed project involves a zoning ordinance amendment <br />No new or more severe <br />affecting only the MULW zoning district. The proposed project <br />impacts would occur as a <br />would increase density and intensity of development within <br />result of the proposed <br />those districts; however, no changes would be made to the <br />project. <br />allowed land uses or building standards such that developments <br />minimizing the impacts of noise sources. Therefore, the <br />would physically divide the existing community. <br />proposed project would not result in any new impact or change <br />Impact 4.10-1: Existing and future noise levels at the locations Less than <br />The proposed project would increase the maximum allowable <br />of proposed residences and other noise sensitive developments significant <br />dwelling units on MULW district, and no new sensitive land uses <br />allowable under the General Plan could exceed the City's noise <br />would be added. Furthermore, the proposed project would not <br />thresholds of acceptability. <br />alter existing General Plan policies and programs aimed at <br />minimizing the impacts of noise sources. Therefore, the <br />proposed project would not result in any new impact or change <br />in circumstances that would affect the environment. <br />32 <br />Similar to the conclusions in <br />the General Plan EIR, the <br />proposed project would <br />result in less than significant <br />impacts from noise. No new <br />or more severe impacts <br />would occur. Impacts would <br />be within the scope of <br />those identified in the <br />General Plan EIR. <br />649 <br />