My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-12-16 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-12-16 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:17:00 PM
Creation date
12/13/2019 1:39:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/16/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
866
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.D. - Page 58 of 126 <br />City of Redwood City <br />Mixed -Use Live/Work and Emergency Shelter Zoning Amendment Project <br />Impact 4.15-5: Development allowed by the General Plan may Less than <br />generate a demand for wastewater treatment that exceeds the significant <br />capacity of the wastewater treatment provider. <br />Impact 4.15-6: Development allowed by the General Plan could Less than <br />result in increased solid waste generation over existing levels, significant <br />but would not require additional landfill capacity. The General <br />Plan would comply with pertinent regulations regarding solid <br />waste. <br />42 <br />The Final EIR concluded that development under the General <br />Similar to the conclusions in <br />Plan would not increase the City's wet weather flow potential <br />the General Plan EIR, the <br />beyond its current capacity allocation. Additionally, <br />proposed project would <br />implementation of General Plan policies and programs such as <br />result in less than significant <br />Policy BE -22.2 which requires all new development to pay its fair <br />impacts from increased <br />share contributions toward the cost of any needed new <br />demand on wastewater <br />infrastructure, including wastewater treatment capacity would <br />treatment facilities. No new <br />ensure impacts to waste water capacity would be less than <br />or more severe impacts <br />significant. <br />would occur. Impacts would <br />The proposed project would increase density and intensity of <br />be within the scope of <br />development in the MULW district. As discussed in Section 2, <br />those identified in the <br />Project Description, the proposed project would not result in an <br />General Plan EIR. <br />increase in building footprint beyond that allowed in the New <br />General Plan. Therefore, there would be no change in the <br />amount of impervious surface in the project area as a result of <br />the proposed project. Furthermore, the proposed project would <br />not alter existing General Plan policies and program aimed at <br />reducing impacts to waste water capacity nor result in changes <br />to the Silicon Valley Clean Water's 10 -year Capital Improvement <br />Program. Therefore, the proposed project would not result in a <br />new impact or change in circumstances effecting the <br />environment. <br />The Final EIR concluded that growth allowed under the General <br />Similar to the conclusions in <br />Plan could increase solid waste generation by 60 tons per day, <br />the General Plan EIR, the <br />which is equivalent to less than 1 percent of the maximum <br />proposed project would <br />permitted capacity of landfills serving the plan area. According to <br />result in less than significant <br />the Final EIR, under the General Plan, remaining permitted <br />impacts from increased <br />capacity at area landfills would be approximately 60 tons per <br />solid waste. No new or <br />day. <br />more severe impacts would <br />Given that the proposed project would increase the population <br />occur. Impacts would be <br />by 1.4 percent above levels analyzed in the Final EIR and waste <br />within the scope of those <br />generated by development under the General Plan was <br />identified in the General <br />estimated at 60 tons per day, it can be estimated that the <br />Plan EIR. <br />proposed project would generate approximately 6 tons of solid <br />waste per day. This would be within the existing permitted <br />capacity of landfills serving the project area. Therefore, no new <br />impacts or changes in circumstances affecting the environment <br />would occur. <br />659 <br />
The URL can be used to link to this page
Your browser does not support the video tag.