7. D. - Page 78 of 126
<br />Redwood City Rezoning
<br />Table 3
<br />Roadway Segment Level of Service Criteria
<br />February 7, 2019
<br />Roadway Segment L05-hresho ids �B'-d rect'ona ' - `
<br />Facility Type •S A LOS B LOS•
<br />4 -Lane Freeway 2,220 4,020 5,760
<br />E -Lane Freeway 3,400 6,160 8,800
<br />9 -Lane Freeway 4,640 8,400 11,900
<br />F
<br />7,140
<br />10,820
<br />14,560
<br />LOS
<br />8,020
<br />12,120
<br />15,28D
<br />2 -Lane Undivided Arter'aI' 910
<br />1,670
<br />1,77a
<br />3 -Lane Arterial (2 lanes in one dirertion)3 1,310
<br />2,060
<br />2,170
<br />3 -Lane Arterial (1 lane 'n each direction plus a T LTL)'` 1,144
<br />2,ogo
<br />2,210
<br />4 -Lane Undivided Arterial- 1,750
<br />2,740
<br />2,890
<br />--Lane a'v'ded Krteria13 1,920
<br />3,540
<br />3,740
<br />5 -Lane a'v'ded Arterial (3 lanes in one direction)' 2,250
<br />4,430
<br />4,670
<br />E -Lane C ,, ded .Arterials 2,710
<br />5,320
<br />5,640
<br />2 -Lane Collector' 260 520 780
<br />1,100
<br />1,290
<br />3 -Lane Co e=r P 'ane -n each direction plus a TWLTL)"r: &50 560 9W
<br />1,3W
<br />1,610
<br />4 -Lane Collector' 390 780 1,170
<br />1,650
<br />1,944
<br />Notes:
<br />1. The L05 capac'tythresho ds are based on HCM 2000 methodology and are generally
<br />appropriate
<br />for
<br />suburban areas.
<br />2. Peak hour capac'tes are assumed to be Sa percent ofthe daily traffic volume.
<br />3. LOSA and B are not achievable for arter'.a. roadways based on the HCM 2000 methods and def'n't'ons.
<br />4. TW LTL = Two-way left -turn lane
<br />5. For co I lector roadway segments, the capacity limitation -is re lated to neighborhood
<br />qua 1-ity of
<br />1-ife
<br />rather than the physical carrying capacity of the road. This assumes a standard suburban neighborhood,
<br />4a -foot roadway width, and 25 mile per hour speed limit with normal speed Violation rates.
<br />Source: Fedwood Oty New General Plan frrulorrrmeval Impact Report 2010-
<br />A freeway segment is considered to operate at an acceptable level of service if the segment operates
<br />at or better than the level of service standard identified for that segment by the County congestion
<br />management agency. Per CMP technical guidelines, analysis for freeway segment level of service is
<br />required for segments to which the project is expected to add one percent or more to the segment
<br />capacity.
<br />Roadway segments analyzed were selected based on available future volume data from the 2010
<br />Redwood City Environmental Impact Report. Figure 2 shows the roadway segments that were analyzed
<br />as part of the transportation study.