My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-01-28 Clsd and Reg
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-01-28 Clsd and Reg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 11:25:42 AM
Creation date
1/24/2008 4:31:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
1/28/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7A <br />Page 43 <br /> <br />transit and pedestrian-oriented districts where residents will have a smaller environmental <br />footprint than a comparable level of development in less dense areas. Nevertheless, CirclePoint <br />anticipates that the projected population and employment growth in the General Plan, unless very <br />modest, will have significant environmental impacts related to traffic and transportation and <br />potentially noise, air quality, and public services/utilities. <br /> <br />While the document will be primarily focused on regulatory compliance, the EIR will also tell the <br />environmental story of Redwood City through detailed discussions of baseline conditions. The <br />document will be written in a widely accessible manner, with illustrations and a glossary to foster <br />understanding of critical issues. The Introduction section will include a reader's guide to facilitate <br />understanding of the many potential future uses of the EIR. <br /> <br />Although neither the State of California nor the Bay Area Air Quality Management District have <br />developed thresholds for emissions of gases known to contribute to global warming, numerous <br />planning documents are currently being challenged for lack of discussion of this topic. Most <br />notably, the EIR for the San Bernardino County General Plan has been challenged in court by the <br />State Attorney General for the document's failure to address potential greenhouse gas emissions <br />and global warming impacts. CirclePoint will estimate setting year greenhouse gas emissions in <br />the City, from both mobile sources (primarily vehicles) as well as stationary sources, including <br />homes, businesses, and institutional uses. <br /> <br />Circle Point will estimate emissions of the three major greenhouse gases (carbon dioxide, <br />methane, and nitrous oxide) at buildout of the General Plan, comparing these levels to baseline <br />year estimates. CirclePoint will include discussion of greenhouse gases and global warming <br />impacts within the Air Quality chapter, as well as the Cumulative Impacts chapter. Although at <br />the date of this scope, there are no significance thresholds for these issues at the federal or state <br />level; CirclePoint believes that inclusion of a discussion of this matter is essential to the <br />defensibility of the document. <br /> <br />Environmenta/ Work Tasks <br /> <br />8.1 Notice of Preparation/Scoping <br /> <br />When drafts of the land use and transportation elements have been reviewed, the CEQA scoping <br />process can begin. CirclePoint will facilitate a public scoping meeting to explain and launch the <br />environmental process. The meeting will be designed to allow for interaction from the <br />participants, as well as presentation of the alternatives and findings. CirclePoint will prepare <br />public scoping materials and a scoping package; CirclePoint assumes City planning staff will take <br />the lead in distributing materials to the public and interested agencies. <br /> <br />CirclePoint will prepare the Notice of Preparation in accordance with CEQA Section 15082. The <br />NOP project description will be at a lesser level of detail than the EIR project description, but will <br />include a location map as well as identify the date/location of the scoping meetings. <br /> <br />CirclePoint will work with the City to develop the mailing list and distribute the NOP to interested <br />parties and agencies. CirclePoint will facilitate the scoping meeting and provide sign-in sheets, <br />comment cards, and a summary of the scoping meeting. It is assumed that the City staff will <br />distribute the NOP and make all logistical arrangements for the scoping meetings (room <br />reservation, catering, directional signage,etc). <br /> <br />8.2 Setting, Impacts and Mitigation Measures <br /> <br />SCOPE OF SERVICES <br />Redwood City General Plan <br />January 11, 2008 <br />Page 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.