My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-01-28 Clsd and Reg
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-01-28 Clsd and Reg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 11:25:42 AM
Creation date
1/24/2008 4:31:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
1/28/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1E <br />Page 1 0 <br /> <br />. Cross Connection Testing - will become part of the construction contract requirements <br />and will be performed by the construction contractor using a certified cross-connection <br />control specialist. Testing will be witnessed by the Consultant. <br /> <br />. Potholing services for selected existing utilities are included and will be performed by our <br />subconsultant, Miller Pipeline, using vacuum excavation techniques. The excavations <br />will be patched with a cold patch, where they are made in pavement. <br /> <br />. The design and construction of the treatment, storage, pumping and distribution pipelines <br />will be provided under separate agreements with consultants and are not a part of this <br />scope of services. However, the scope of services herein provides for the coordination of <br />the preliminary service laterals locations for the distribution pipeline design team's use. <br /> <br />Contract Documents and Technical Specifications <br /> <br />. Consultant will develop and maintain general design criteria and standards for retrofits <br />that will be applied to all subsequent retrofit designs. <br /> <br />. Contract documents to be used for bidding and construction of customer retrofits under <br />this project will be prepared assuming: <br /> <br />. City's Bidding and Contract Documents will be used <br /> <br />. City's General and Supplemental Conditions will be used <br /> <br />. City's drafting standards and potable water system pipeline design details will be <br />used/modified as required to meet DHS requirements for recycled water systems. <br /> <br />. Kennedy/Jenks' Technical Specifications and Design Drawings will be used. <br /> <br />Bidding and Construction <br /> <br />It is assumed that the customer retrofit sites will be grouped for bidding and construction. Only <br />one bid package is assumed for this scope of services. Additional bid packages can be provided <br />as supplemental services, as described herein. <br /> <br />Other assumptions as stated on the enclosed tables and Scope of Services. <br /> <br />Agreement over $1 OK <br />KennedyJenks Rev-2 112603 <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.