<br />6.1E <br />Page 13 <br /> <br />Consultant shall prepare a work plan for the project, including a quality assurance plan. <br />Consultant shall also prepare monthly invoices, including a brief summary of the project status <br />with each invoice. The status report will include an update of the work being performed, and the <br />status (originally planned, projected and achieved) of individual customer retrofits with respect to <br />engineering and construction cost and water usage. The consultant will co-ordinate with the <br />City's Finance Department to develop an approach and document format for the cost and water <br />usage. This information will be used by the Program Manager and the City to track the costs and <br />water supply benefits of the project. <br /> <br />Task 1.2 - City Retrofit Coordination Meetings <br /> <br />Consultant shall coordinate with the City through meetings and conespondence. It is anticipated <br />that a, two-hour-1ong project status/coordination meeting will be conducted with the City every <br />other week over the contract period. Consultant's project manager or designated representative <br />will attend each meeting. <br /> <br />Task 1.3 - QA/QC Program <br /> <br />Consultant shall develop and execute a Quality Assurance/Quality Control (QA/Qc) Program <br />specific to this project. Quality reviews will be conducted prior to the Preliminary and Final <br />Design submittals for each retrofit. <br /> <br />Task 1.4 - Schedule <br /> <br />Consultant shall prepare a Gantt chart schedule for design and construction of each site retrofit. <br />The schedule format will be coordinated with the City's program manager. The schedule will be <br />updated monthly and will serve as the basis of preparing the status reports under Task 1.1. <br /> <br />Task 2 - Service Lateral Coordination <br /> <br />To assist in design of the pipeline conveyance system (by others) from the treatment facilities to <br />the customer sites, Consultant shall perform preliminary service lateral reconnaissance. The <br />assessment will determine existing meter locations and establish preliminary locations for new <br />service lateral pipelines that will be constructed to the customer site boundary. This information <br />will be provided by Consultant to the City via field notes and mark-ups of base drawings <br />provided by the pipeline designer. The lateral will be designed and constructed by others. <br /> <br />Task 3 - Customer Coordination, Data Gathering and Site Fieldwork <br /> <br />The engineering labor effort for this task is estimated to be four hours per customer site. <br /> <br />Task 3.1 - Preliminary Customer Site Visit <br /> <br />Attend and participate in an initial customer site visit scheduled by a City representative. This <br />meeting will occur after the City has performed BMP5 related work, has developed a customer <br />information package, and has obtained a notice of intent, application for service and right-of- <br />entry agreement from the customer. <br /> <br />Agreement over $1 OK <br />KennedyJenks Rev-2 112603 <br /> <br />8 <br />