My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-01-28 Clsd and Reg
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-01-28 Clsd and Reg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 11:25:42 AM
Creation date
1/24/2008 4:31:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
1/28/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1E <br />Page 14 <br /> <br />Task 3.2 - Existing Data Review <br /> <br />Review available information provided by via the City's BMP5 Program relative to existing <br />water services, meters and onsite water systems and landscapes, site plans, etc. Create a list of <br />additional data needs for Preliminary Retrofit Design (Task 4). <br /> <br />Task 3.3 - Preliminary GolNo-Go Decision <br /> <br />Based on the results of the initial customer meeting and data review, assist the City in <br />determining the Go-No/Go decision on the feasibility of service and proceeding with Preliminary <br />Design. A conceptual cost estimate and water demand will be provided, based on experience <br />with similar site classifications (no detailed quantity takeoffs, etc.) <br /> <br />Task 4 - Preliminary Retrofit Design <br /> <br />Consultant shall prepare a Site data collection priority schedule for City review and approval. <br />The priority data schedule shall contain Site infonnation to facilitate the final design and <br />construction of the on-site recycled water infrastructure and identify any modification needed to <br />be performed in the immediately adjacent public right of way. Upon City's approval of the <br />priority list and upon written authorization from the City, the Consultant shall, for up to 57 <br />Customer Sites perform the following services. The engineering labor effort for Preliminary <br />Retrofit Design is estimated to be 28 hours per customer site. <br /> <br />Task 4.1 - Detailed Site Assessment <br /> <br />Perform detailed reconnaissance of customer site, building on prior work by the City for the <br />BMP5 Program. Investigate setup of existing potable water service and onsite systems to assess <br />the feasibility of separating potable and non-potable uses. Operation of customer's water system <br />may be required during this assessment as allowed by the agreement provided by City. <br /> <br />As appropriate for each Customer site, detailed reconnaissance shall consider the following <br />items: <br /> <br />Site Characteristics <br />Type of soil, landscape to be irrigated <br />Area of recycled water use <br />Potential areas of overspray, ponding or runoff <br />Presence of drinking fountains and other potable water facilities <br />Existing backfIow protection on potable water service <br />Potable and Recycled water service/meter location <br />Appropriate locations for advisory signs <br />Surrounding land use or other site restrictions (e.g., wells) <br />Site drainage and subdrains <br /> <br />Irrigation Facilities <br />Irrigation system record drawings (if available) <br /> <br />Agreement over $10K <br />KennedyJenks Rev-2 112603 <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.