My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-01-28 Clsd and Reg
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-01-28 Clsd and Reg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 11:25:42 AM
Creation date
1/24/2008 4:31:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
1/28/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1E <br />Page 16 <br /> <br />Other utilities, facilities or equipment <br /> <br />Accommodation of events during night irrigation, scheduling (baseball games, etc) <br /> <br />Task 4.3.2 - Preliminary Construction Cost Estimate and Schedule <br /> <br />A preliminary estimate of probable cost and a construction schedule will be prepared for each <br />site. This cost estimate will include cost of labor, materials and other construction costs. <br /> <br />Task 4.4 - Submit Preliminary Retrofit Design to City for Customer Review <br /> <br />A preliminary design submittal will be prepared for each detailed reconnaissance Site. The <br />submittal will contain a preliminary site plan, preliminary retrofit design drawings, a preliminary <br />estimate of probable cost, recycled water demand projection, and a preliminary construction <br />schedule. Two (2) copies copy will be submitted to the City: one copy for the City's reference <br />file and one copy to be delivered to the Customer for review. This is considered the preliminary <br />design submittal. It is anticipated that no significant comments will be received from the <br />customer after submittal of the preliminary design and no revision or resubmittal of the <br />preliminary design will be required. <br /> <br />Task 5 - Final Retrofit Design <br /> <br />The engineering labor effOli for Final Retrofit Design is estimated to be 41 hours per customer <br />site. <br /> <br />Task 5.1 - Final Design Drawings <br /> <br />Detailed AutoCAD design drawings will be developed from digitization of existing site maps, <br />record drawings or aerial photos. The on-site retrofit will indicate the location for capping of <br />potable lines, new connections to the recycled water systems, necessary provisions for cross <br />connection control, backflow prevention and separation, location of signage to comply with State <br />and County Health Departments and construction details. The limits of work shall include the <br />Customer recycled water meter and box and continue throughout the inigation or industrial <br />system as necessary for a complete retrofit. Work shall include identification and design of any <br />modifications of the existing on site irrigation or industrial system to bring it into confonnance <br />with local and state standards for recycled water. A typical Final Design Package will consist of <br />four 11 X 17 inch sized drawings: <br />. A title page showing an overall plan view of the building, existing utilities, <br />landscape, adjacent properties and recycled water use areas <br /> <br />. A detailed view of the actual work to be performed around the existing meters, <br />highlighting the areas for separation and point of connection <br /> <br />. Standard drawing details <br /> <br />. Standard notes <br /> <br />Task 5.2 - Final Construction Cost Estimate and Schedule <br /> <br />Agreement over $1 OK <br />KennedyJenks Rev-2 112603 <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.