Laserfiche WebLink
<br />6.1E <br />Page 17 <br /> <br />A final estimate of probable cost and a construction schedule will be prepared for each Site. This <br />cost estimate will include cost of materials, labor, and contractor overhead and profit. <br /> <br />Task 5.3 - Submit Final Design Package to City <br /> <br />A final design submittal will be prepared for each Site. The submittal will contain the final <br />design package, a final estimate of probable cost and recycled water demand, a final construction <br />schedule, and a checklist for the City to use in its review of the submittal. Three (3) copies of the <br />submittal will be submitted to City staff for review and approval. One copy will be returned with <br />review comments to Consultant. <br /> <br />Task 6 - Design Package Approval Coordination <br /> <br />Task 6.1 - City Approval <br /> <br />Consultant will provide an original set of drawings to the City for signature. Once the City has <br />approved and signed the drawings, they will be returned to the Consultant to be stamped and <br />signed by a Registered Professional Engineer in the State of California. Consultant will convert <br />the fully signed drawings into digital format to be posted on the Project Portal (developed under <br />separate contract). <br /> <br />Task 6.2 - DHS Approval <br /> <br />Submit three (3) copies of stamped, signed Final Design Drawings to DHS on behalf of the City. <br />The assumption is that the City will self monitor the retrofits under the DHS General Permit <br />Guidelines and that each design package will be approved or accepted with the first submittal, <br />with possible corrections noted. Resubmittals and revisions due to DHS comments are not <br />included in this work effort or scope. Once DHS acceptance or signature is obtained, the design <br />package is considered complete and ready for bidding and construction. <br /> <br />Task 7 - Bidding Services <br /> <br />The engineering labor effort for bidding services is developed for one "Group Bid" package that <br />will be comprised of customer sites selected by the City. The engineering and support labor <br />effort to execute the group I or subsequent group bids is estimated to be 56 hours. <br /> <br />Task 7.1 - Prepare strategy and criteria for grouping sites into bid packages <br /> <br />Consultant will establish the strategic approach and criteria for grouping individual customer site <br />designs into discreet bid packages over time, and as site designs are approved. The City's <br />Engineering and Construction division will oversee the bid and award process. It is anticipated <br />that multiple retrofit bid packages will be issued by the City over the duration of the Project. <br /> <br />Task 7.2 - Prepare Contract Documents for Group 1 Bid <br /> <br />Consultant will edit and prepare City Contract Documents, bid forms, general and supplemental <br />conditions and combined these documents with each site retrofit design to be included in Group <br />1 Bid. When project is complete and all construction documents are approved and ready for <br />Agreement over $1 OK 12 <br />KennedyJenks Rev-2 112603 <br />