My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt20 Toole Design Group
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2020
>
Under 60K
>
Agmt20 Toole Design Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2021 9:33:19 AM
Creation date
1/3/2020 4:47:08 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Toole Design Group
PROJECT NAME
Vera Ave Bicycle Blvd project management
RMP File Number
304.5
Date
1/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City will send one set of comments on the submitted 95% PS&E and cost estimates to <br />the consultant. Consultant shall revise/update the plan set accordingly. Consultant shall <br />develop a response -to -comments spreadsheet detailing how City's comments are <br />addressed. <br />In case of a discrepancy or disagreement, consultant and city staff shall set up a call to <br />review the issues in more detail before the final package is updated. Once there is <br />agreement on all edits/comments from the City, consultant shall finalize the design <br />package and submit the formal PS&E and cost estimates. <br />TASK 6 DELIVERABLES <br />• Two sets of final design plans (24"x36") in hard copy in the scale of 1"=20" <br />• Two sets of final design plans (11 "x17") in hard copy <br />• PDF version of final design plans <br />• Engineer's cost estimate in PDF format and source file (for plans transmit format <br />that is compatible with AutoCAD (version 2015)) <br />Construction details and specifications <br />TASK 7: CONSTRUCTION ENGINEERING SUPPORT <br />Consultant shall provide construction engineering and bid support to the City as technical <br />questions arise during the bid and construction process. Construction engineering <br />support includes: <br />• Provide information in response to bidders' questions <br />• Prepare addenda to the bid documents <br />• Prepare conform set drawing <br />• Review and approve shop drawing/submittals <br />• Attend pre -construction meeting <br />• Review and respond to Requests for Information (RFIs) during construction <br />• Prepare Record (as built) drawings <br />TASK 7 DELIVERABLES <br />• Response to questions <br />• Addenda <br />• Responses to RFIs <br />• PDF copies of shop drawings/submittals during construction <br />• Conform set drawing in PDF format <br />• Record drawing in PDF and AutoCAD formats <br />TASK 8: DESIGN SERVICES DURING INSTALLATION <br />REV: 11-27-19 PR <br />ATTY/AGR.2019.295/roole Design Group (Page 15 of 17) <br />
The URL can be used to link to this page
Your browser does not support the video tag.