Laserfiche WebLink
7.A. - Page 91 of 285 <br />2019 Energy Efficiency Ordinance Cost-effectiveness Study <br />Table 16: Multifamily Electrification Results (Per Dwelling Unit) <br />W <br />2019-08-01 <br />343 <br />On -Bill Cost-effectiveness' <br />TDV Cost-effectiveness <br />Average Annual Utility Bill <br />Lifetime NPV <br />Lifetime NPV <br />Savings <br />Net <br />Equipment <br />On -Bill <br />Equipment <br />TDV <br />Natural <br />Utility <br />Utility Bill <br />Cost <br />B/C <br />TDV Cost <br />Cost <br />B/C <br />CZ <br />Utility <br />Electricity <br />Gas <br />Savings <br />Savings <br />Savings <br />Ratio' <br />Savings <br />Savings <br />Ratio <br />2019 Code Compliant Home <br />01 <br />PG&E <br />-($396) <br />+$193 <br />-($203) <br />-($6,079) <br />+$2,337 <br />0.4 <br />-($5,838) <br />+$5,899 <br />1.0 <br />02 <br />PG&E <br />-($310) <br />+$162 <br />-($148) <br />-($4,450) <br />+$2,337 <br />0.5 <br />-($4,144) <br />+$5,899 <br />1.4 <br />03 <br />PG&E <br />-($277) <br />+$142 <br />-($135) <br />-($4,041) <br />+$2,337 <br />0.6 <br />-($4,035) <br />+$5,899 <br />1.5 <br />04 <br />PG&E <br />-($264) <br />+$144 <br />-($120) <br />-($3,595) <br />+$2,337 <br />0.6 <br />-($3,329) <br />+$5,899 <br />1.8 <br />05 <br />PG&E <br />-($297) <br />+$140 <br />-($157) <br />-($4,703) <br />+$2,337 <br />0.5 <br />-($4,604) <br />+$5,899 <br />1.3 <br />05 <br />PG&E/SoCalGas <br />-($297) <br />+$178 <br />-($119) <br />-($3,573) <br />+$2,337 <br />0.7 <br />-($4,604) <br />+$5,899 <br />1.3 <br />06 <br />SCE/SoCalGas <br />-($191) <br />+$161 <br />-($30) <br />-($902) <br />+$2,337 <br />2.6 <br />-($2,477) <br />+$5,899 <br />2.4 <br />07 <br />SDG&E <br />-($206) <br />+$136 <br />-($70) <br />-($2,094) <br />+$2,337 <br />1.1 <br />-($2,390) <br />+$5,899 <br />2.5 <br />08 <br />SCE/SoCalGas <br />-($169) <br />+$157 <br />-($12) <br />-($349) <br />+$2,337 <br />6.7 <br />-($2,211) <br />+$5,899 <br />2.7 <br />09 <br />SCE/SoCalGas <br />-($177) <br />+$159 <br />-($18) <br />-($533) <br />+$2,337 <br />4.4 <br />-($2,315) <br />+$5,899 <br />2.5 <br />10 <br />SCE/SoCalGas <br />-($183) <br />+$159 <br />-($23) <br />-($697) <br />+$2,337 <br />3.4 <br />-($2,495) <br />+$5,899 <br />2.4 <br />10 <br />SDG&E <br />-($245) <br />+$139 <br />-($106) <br />-($3,192) <br />+$2,337 <br />0.7 <br />-($2,495) <br />+$5,899 <br />2.4 <br />11 <br />PG&E <br />-($291) <br />+$153 <br />-($138) <br />-($4,149) <br />+$2,337 <br />0.6 <br />-($4,420) <br />+$5,899 <br />1.3 <br />12 <br />PG&E <br />-($277) <br />+$155 <br />-($122) <br />-($3,665) <br />+$2,337 <br />0.6 <br />-($3,557) <br />+$5,899 <br />1.7 <br />13 <br />PG&E <br />-($270) <br />+$146 <br />-($124) <br />-($3,707) <br />+$2,337 <br />0.6 <br />-($3,821) <br />+$5,899 <br />1.5 <br />14 <br />SCE/SoCalGas <br />-($255) <br />+$187 <br />-($69) <br />-($2,062) <br />+$2,337 <br />1.1 <br />-($3,976) <br />+$5,899 <br />1.5 <br />14 <br />SDG&E <br />-($328) <br />+$175 <br />-($154) <br />-($4,607) <br />+$2,337 <br />0.5 <br />-($3,976) <br />+$5,899 <br />1.5 <br />15 <br />SCE/SoCalGas <br />-($154) <br />+$142 <br />-($12) <br />-($367) <br />+$2,337 <br />6.4 <br />-($2,509) <br />+$5,899 <br />2.4 <br />16 <br />PG&E <br />-($404) <br />+$224 <br />-($180) <br />-($5,411) <br />+$2,337 <br />0.4 <br />-($5,719) <br />+$5,899 <br />1.0 <br />Efficiency & PV Package <br />01 <br />PG&E <br />-($19) <br />+$193 <br />+$174 <br />+$5,230 <br />-($3,202) <br />1.6 <br />+$2,467 <br />+$361 <br />>1 <br />02 <br />PG&E <br />-($10) <br />+$162 <br />+$152 <br />+$4,549 <br />-($1,375) <br />3.3 <br />+$2,605 <br />+$2,187 <br />>1 <br />03 <br />PG&E <br />-($12) <br />+$142 <br />+$130 <br />+$3,910 <br />-($936) <br />4.2 <br />+$1,632 <br />+$2,626 <br />>1 <br />04 <br />PG&E <br />-($8) <br />+$144 <br />+$136 <br />+$4,080 <br />-($822) <br />5.0 <br />+$2,381 <br />+$2,740 <br />>1 <br />05 <br />PG&E <br />-($19) <br />+$140 <br />+$121 <br />+$3,635 <br />-($956) <br />3.8 <br />+$1,403 <br />+$2,606 <br />>1 <br />05 <br />PG&E/SoCalGas <br />-($19) <br />+$178 <br />+$159 <br />+$4,765 <br />-($956) <br />5.0 <br />+$1,403 <br />+$2,606 <br />>1 <br />06 <br />SCE/SoCalGas <br />-($84) <br />+$161 <br />+$77 <br />+$2,309 <br />-($243) <br />9.5 <br />+$1,940 <br />+$3,319 <br />>1 <br />07 <br />SDG&E <br />-($49) <br />+$136 <br />+$87 <br />+$2,611 <br />+$75 <br />>1 <br />+$1,583 <br />+$3,638 <br />>1 <br />08 <br />SCE/SoCalGas <br />-($74) <br />+$157 <br />+$83 <br />+$2,480 <br />+$96 <br />>1 <br />+$1,772 <br />+$3,658 <br />>1 <br />09 <br />SCE/SoCalGas <br />-($76) <br />+$159 <br />+$82 <br />+$2,469 <br />+$104 <br />>1 <br />+$1,939 <br />+$3,667 <br />>1 <br />10 <br />SCE/SoCalGas <br />-($79) <br />+$159 <br />+$80 <br />+$2,411 <br />-($34) <br />70.9 <br />+$1,737 <br />+$3,528 <br />>1 <br />10 <br />SDG&E <br />-($77) <br />+$139 <br />+$61 <br />+$1,842 <br />-($34) <br />54.2 <br />+$1,737 <br />+$3,528 <br />>1 <br />11 <br />PG&E <br />-($25) <br />+$153 <br />+$128 <br />+$3,834 <br />-($1,264) <br />3.0 <br />+$2,080 <br />+$2,298 <br />>1 <br />12 <br />PG&E <br />-($11) <br />+$155 <br />+$144 <br />+$4,316 <br />-($1,498) <br />2.9 <br />+$2,759 <br />+$2,064 <br />>1 <br />13 <br />PG&E <br />-($26) <br />+$146 <br />+$121 <br />+$3,625 <br />-($1,125) <br />3.2 <br />+$2,083 <br />+$2,437 <br />>1 <br />14 <br />SCE/SoCalGas <br />-($99) <br />+$187 <br />+$87 <br />+$2,616 <br />-($1,019) <br />2.6 <br />+$2,422 <br />+$2,543 <br />>1 <br />14 <br />SDG&E <br />-($86) <br />+$175 <br />+$88 <br />+$2,647 <br />-($1,019) <br />2.6 <br />+$2,422 <br />+$2,543 <br />>1 <br />15 <br />SCE/SoCalGas <br />-($67) <br />+$142 <br />+$75 <br />+$2,247 <br />+$511 <br />>1 <br />+$1,276 <br />+$4,073 <br />>1 <br />16 <br />PG&E <br />-($24) <br />+$224 <br />+$200 <br />+$5,992 <br />-($2,087) <br />2.9 <br />+$2,629 <br />+$1,476 <br />>1 <br />W <br />2019-08-01 <br />343 <br />