Laserfiche WebLink
7.A. - Page 187 of 285 <br />2019 Nonresidential New Construction Reach Code Cost Effectiveness Study <br />10 Power Adjustment Factors allow designers to tradeoff increased lighting power densities for more efficient designs. In this study, PAF -related measures <br />assume that the more efficient design is incorporated without a tradeoff for increased lighting power density. <br />11 https://slipstreaminc.org/sites/default/files/2018-12/task-tuning-report-mndoc-2015.pdf <br />12 <br />2019-07-25 <br />• <br />Measure Applicability <br />• Included in Packages 1A, 16, 3A, 3C <br />Incremental Cost <br />Sources & Notes <br />— Not applicable <br />Small Hotel <br />Measure <br />Baseline T24 Requirement <br />Med <br />Med <br />Office <br />Retail <br />Guest <br />Comm <br />rooms <br />Spaces <br />No requirement, but Power <br />Adjustment Factor (PAF) credit <br />Industry report on institutional <br />Institutional Tuning <br />of 0.10 available for luminaires <br />• <br />• <br />— <br />• <br />$0.06/ft2 <br />tuning"in <br />non-daylit areas and 0.05 for <br />luminaires in daylit areas" <br />No requirement, but PAF credit <br />Given the amount of lighting <br />Daylight Dimming Plus Off <br />• <br />— <br />— <br />— <br />$0 <br />controls already required, this <br />of 0.10 available. <br />measure is no additional cost. <br />2 workstations per sensor; <br />1 fixture per workstation; <br />$189 /sensor; $74 <br />4 workstations per master <br />Occupant Sensing in Open <br />No requirement, but PAF credit <br />/powered relay; <br />relay; <br />Plan Offices <br />of 0.30 available. <br />• <br />_ <br />_ <br />_ <br />$108 /secondary <br />120 ft2/workstation in open <br />relay <br />office area, which is 53% of <br />total floor area of the medium <br />office <br />10 Power Adjustment Factors allow designers to tradeoff increased lighting power densities for more efficient designs. In this study, PAF -related measures <br />assume that the more efficient design is incorporated without a tradeoff for increased lighting power density. <br />11 https://slipstreaminc.org/sites/default/files/2018-12/task-tuning-report-mndoc-2015.pdf <br />12 <br />2019-07-25 <br />• <br />