Laserfiche WebLink
7.A. - Page 196 of 285 2019 Nonresidential New Construction Reach Code Cost Effectiveness Study <br />The Reach Code Team calculated costs to increase electrical capacity for heat pump water heaters in the <br />small hotel similarly. <br />Figure 13. Medium Office Electrical Infrastructure Costs for All -Electric Design <br />A <br />- <br />No. VAV Boxes <br />60 <br />B <br />- <br />VAV box heating capacity (watts) <br />4,748 <br />C <br />- <br />No. hot water pumps <br />2 <br />D <br />- <br />Hot water pump power (watts) <br />398 <br />E <br />- <br />Voltage <br />208 <br />F <br />(AxB - CxD)/E <br />Panel ampacity required <br />1,366 <br />G <br />F/400 <br />Number of 400 -amp panels required <br />4 <br />H <br />- <br />Cost per 400 -amp panel <br />$3,100 <br />1 <br />GxH <br />Total panel cost <br />$12,400 <br />J <br />- <br />Total electrical line length required (ft) <br />4,320 <br />K <br />- <br />Cost per linear foot of electrical line <br />$3.62 <br />L <br />JxK <br />Total electrical line cost <br />$15,402 <br />I + L <br />Total electrical infrastructure incremental cost <br />$27,802 <br />3.3.2.2 Natural Gas <br />This analysis assumes that in an all -electric new construction scenario natural gas would not be supplied <br />to the site. Eliminating natural gas in new construction would save costs associated with connecting a <br />service line from the street main to the building, piping distribution within the building, and monthly <br />connection charges by the utility. <br />The Reach Code Team determined that for a new construction building with natural gas piping, there is a <br />service line (branch connection) from the natural gas main to the building meter. In the medium office <br />prototype, natural gas piping is routed to the boiler. The Reach Code Team assumed that the boiler is on <br />the first floor, and that 30 feet of piping is required from the connection to the main to the boiler. The <br />Reach Code Team assumed 1" corrugated stainless steel tubing (CSST) material is used for the plumbing <br />distribution. The Reach Code Team included costs for a natural gas plan review, service extension, and a <br />gas meter, as shown in Figure 14 below. The natural gas plan review cost is based on information received <br />from the City of Palo Alto Utilities. The meter costs are from PG&E and include both material and labor. <br />The service extension costs are based on guidance from PG&E, who noted that the cost range is highly <br />varied and that there is no "typical" cost, with costs being highly dependent on length of extension, <br />terrain, whether the building is in a developed or undeveloped area, and number of buildings to be <br />served. While an actual service extension cost is highly uncertain, the team believes the costs assumed in <br />this analysis are within a reasonable range based on a sample range of costs provided by PG&E. These <br />costs assume development in a previously developed area. <br />21 © 2019-07-25 <br />448 <br />