Laserfiche WebLink
7.A. - Page 195 of 285 2019 Nonresidential New Construction Reach Code Cost Effectiveness Study <br />Figure 12. Small Hotel HVAC and Water Heating System Costs <br />Climate Zone <br />Mixed Fuel <br />Baseline <br />All Electric System <br />Incremental cost <br />for All -Electric <br />CZ01 <br />$2,337,531 <br />$1,057,178 <br />$(1,280,353) <br />CZ02 <br />$2,328,121 <br />$1,046,795 <br />$(1,281,326) <br />CZ03 <br />$2,294,053 <br />$1,010,455 <br />$(1,283,598) <br />CZ04 <br />$2,302,108 <br />$1,018,675 <br />$(1,283,433) <br />CZ05 <br />$2,298,700 <br />$1,015,214 <br />$(1,283,486) <br />CZ06 <br />$2,295,380 <br />$1,011,753 <br />$(1,283,627) <br />CZ07 <br />$2,308,004 <br />$1,026,029 <br />$(1,281,975) <br />CZ08 <br />$2,333,662 <br />$1,053,717 <br />$(1,279,946) <br />CZ09 <br />$2,312,099 <br />$1,030,355 <br />$(1,281,744) <br />CZ10 <br />$2,354,093 <br />$1,075,348 <br />$(1,278,745) <br />CZ11 <br />$2,347,980 <br />$1,068,426 <br />$(1,279,554) <br />CZ12 <br />$2,328,654 <br />$1,047,660 <br />$(1,280,994) <br />CZ13 <br />$2,348,225 <br />$1,068,858 <br />$(1,279,367) <br />CZ14 <br />$2,345,988 <br />$1,066,263 <br />$(1,279,725) <br />CZ15 <br />$2,357,086 <br />$1,079,241 <br />$(1,277,845) <br />CZ16 <br />$2,304,094 <br />$1,019,973 <br />$(1,284,121) <br />3.3.2 Infrastructure Impacts <br />Electric heating appliances and equipment often require a larger electrical connection than an equivalent <br />natural gas appliance because of the higher voltage and amperage necessary to electrically generate heat. <br />Thus, many buildings may require larger electrical capacity than a comparable building with natural gas <br />appliances. This includes: <br />♦ Electric resistance VAV space heating in the medium office and common area spaces of the small <br />hotel. <br />♦ Heat pump water heating for the guest room spaces of the small hotel. <br />3.3.2.1 Electrical Panel Sizing and Wiring <br />This section details the additional electrical panel sizing and wiring required for all -electric measures. In an <br />all -electric new construction scenario, heat pumps replace packaged DX units which are paired with either <br />a gas furnace or a hot water coil (supplied by a gas boiler). The electrical requirements of the replacement <br />heat pump would be the same as the packaged DX unit it replaces, as the electrical requirements would <br />be driven by the cooling capacity, which would remain the same between the two units. <br />VAV terminal units with hot water reheat coils that are replaced with electric resistance reheat coils <br />require additional electrical infrastructure. In the case of electric resistance coils, the Reach Code Team <br />assumed that on average, a VAV terminal unit serves around 900 ft2 of conditioned space and has a <br />heating capacity of 5 kW (15 kBtu/hr/ft2). The incremental electrical infrastructure costs were determinec <br />based on RS Means. Calculations for the medium office shown in Figure 13 include the cost to add <br />electrical panels as well as the cost to add electrical lines to each VAV terminal unit electric resistance coil <br />in the medium office prototype. Additionally, the Reach Code Team subtracted the electrical <br />infrastructure costs associated with hot water pumps required in the mixed fuel baseline, which are not <br />required in the all -electric measures. <br />20 © 2019-07-25 <br />447 <br />