Laserfiche WebLink
7.A. - Page 204 of 285 <br />2019 Nonresidential New Construction Reach Code Cost Effectiveness Study <br />Figure 20. Cost Effectiveness for Medium Office Package 2 - All -Electric Federal Code Minimum <br />CZ <br />Utility <br />Elec <br />Savings <br />(kWh) <br />Gas Savings <br />(therms) <br />GHG <br />Reductions <br />(mtons) <br />Comp- <br />Hance <br />Margin <br />Incremental <br />Package <br />Cost" <br />Lifecycle <br />Utility Cost <br />Savings <br />$TDV <br />Savings <br />B/C <br />Ratio <br />(On -bill) <br />B/C <br />Ratio <br />(TDV) <br />NPV (On- <br />bill) <br />NPV <br />(TDV) <br />Package <br />2: All -Electric Federal Code Minimum <br />CZ01 <br />PG&E <br />-53,657 <br />4967 <br />10.1 <br />-15% <br />($87,253) <br />($98,237) <br />($58,420) <br />0.9 <br />1.5 <br />($10,984) <br />$28,833 <br />CZ02 <br />PG&E <br />-49,684 <br />3868 <br />5.0 <br />-7% <br />($73,695) <br />($101,605) <br />($41,429) <br />0.7 <br />1.8 <br />($27,910) <br />$32,266 <br />CZ03 <br />PG&E <br />-35,886 <br />3142 <br />5.6 <br />-7% <br />($82,330) <br />($57,345) <br />($29,592) <br />1.4 <br />2.8 <br />$24,986 <br />$52,738 <br />CZ04 <br />PG&E <br />-48,829 <br />3759 <br />4.7 <br />-6% <br />($69,012) <br />($90,527) <br />($40,570) <br />0.8 <br />1.7 <br />($21,515) <br />$28,443 <br />CZ04-2 <br />CPAU <br />-48,829 <br />3759 <br />4.7 <br />-6% <br />($69,012) <br />($19,995) <br />($40,570) <br />3.5 <br />1.7 <br />$49,018 <br />$28,443 <br />CZ05 <br />PG&E <br />-40,531 <br />3240 <br />4.5 <br />-8% <br />($84,503) <br />($63,663) <br />($39,997) <br />1.3 <br />2.1 <br />$20,840 <br />$44,506 <br />CZ06 <br />SCE <br />-26,174 <br />2117 <br />3.1 <br />-4% <br />($76,153) <br />$24,908 <br />($20,571) <br />>1 <br />3.7 <br />$101,061 <br />$55,581 <br />CZ06-2 <br />LADWP <br />-26,174 <br />2117 <br />3.1 <br />-4% <br />($76,153) <br />$26,366 <br />($20,571) <br />>1 <br />3.7 <br />$102,518 <br />$55,581 <br />CZ07 <br />SDG&E <br />-12,902 <br />950 <br />0.9 <br />-2% <br />($70,325) <br />$46,879 <br />($11,407) <br />>1 <br />6.2 <br />$117,204 <br />$58,918 <br />CZ08 <br />SCE <br />-15,680 <br />1219 <br />1.5 <br />-2% <br />($68,774) <br />$17,859 <br />($12,648) <br />>1 <br />5.4 <br />$86,633 <br />$56,125 <br />CZ08-2 <br />LADWP <br />-15,680 <br />1219 <br />1.5 <br />-2% <br />($68,774) <br />$18,603 <br />($12,648) <br />>1 <br />5.4 <br />$87,376 <br />$56,125 <br />CZ09 <br />SCE <br />-19,767 <br />1605 <br />2.4 <br />-2% <br />($63,102) <br />$20,920 <br />($14,462) <br />>1 <br />4.4 <br />$84,022 <br />$48,640 <br />CZ09-2 <br />LADWP <br />-19,767 <br />1605 <br />2.4 <br />-2% <br />($63,102) <br />$21,929 <br />($14,462) <br />>1 <br />4.4 <br />$85,030 <br />$48,640 <br />CZ10 <br />SDG&E <br />-27,414 <br />2053 <br />2.2 <br />-4% <br />($47,902) <br />$38,918 <br />($23,339) <br />>1 <br />2.1 <br />$86,820 <br />$24,562 <br />CZ10-2 <br />SCE <br />-27,414 <br />2053 <br />2.2 <br />-4% <br />($47,902) <br />$20,765 <br />($23,339) <br />>1 <br />2.1 <br />$68,666 <br />$24,562 <br />CZ11 <br />PG&E <br />-40,156 <br />3062 <br />3.6 <br />-4% <br />($63,987) <br />($72,791) <br />($32,837) <br />0.9 <br />1.9 <br />($8,804) <br />$31,150 <br />CZ12 <br />PG&E <br />-43,411 <br />3327 <br />4.1 <br />-5% <br />($68,343) <br />($85,856) <br />($35,463) <br />0.8 <br />1.9 <br />($17,512) <br />$32,880 <br />CZ12-2 <br />SMUD <br />-43,411 <br />3327 <br />4.1 <br />-5% <br />($68,343) <br />($5,109) <br />($35,463) <br />13.4 <br />1.9 <br />$63,234 <br />$32,880 <br />CZ13 <br />PG&E <br />-39,649 <br />3063 <br />3.8 <br />-4% <br />($62,726) <br />($70,705) <br />($32,408) <br />0.9 <br />1.9 <br />($7,980) <br />$30,318 <br />CZ14 <br />SDG&E <br />-44,322 <br />3266 <br />3.4 <br />-5% <br />($65,156) <br />$6,043 <br />($38,422) <br />>1 <br />1.7 <br />$71,199 <br />$26,735 <br />CZ14-2 <br />SCE <br />-44,322 <br />3266 <br />3.4 <br />-5% <br />($65,156) <br />$4,798 <br />($38,422) <br />>1 <br />1.7 <br />$69,954 <br />$26,735 <br />CZ15 <br />SCE <br />-19,917 <br />1537 <br />1.8 <br />-2% <br />($36,176) <br />$12,822 <br />($15,464) <br />>1 <br />2.3 <br />$48,998 <br />$20,711 <br />CZ16 <br />PG&E <br />-94,062 <br />6185 <br />5.6 <br />-27% <br />($64,096) <br />($212,158) <br />($150,871) <br />0.3 <br />0.4 <br />($148,062) <br />($86,775) <br />CZ16-2 <br />LADWP <br />-94,062 <br />6185 <br />5.6 <br />-27% <br />($64,096) <br />$1,493 <br />($150,871) <br />>1 <br />0.4 <br />$65,589 <br />($86,775) <br />'The Incremental Package Cost is equal to the sum of the incremental HVAC and water heating equipment costs from <br />Figure 10, the electrical infrastructure incremental cost of $27,802 (see section 3.3.2.1), and the natural gas infrastructure incremental costs of $(18,949) (see <br />section 3.3.2.2). <br />29 <br />2019-07-25 <br />456 <br />