My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-01-13 Joint
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-01-13 Joint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:12:51 PM
Creation date
1/10/2020 8:49:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/13/2020
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
1/10/2020 8:53 AM
Modified:
1/10/2020 8:53 AM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.B. - Page 4 of 70 <br />pedestrians, and create space for a central open/green area. This alternative would remove the <br />fence along the Winslow Street side of the Caltrain platform. While this alternative would remove <br />50 parking spaces in the bus station's surface parking lot, these cars could be accommodated in <br />the underground garage or in the Perry Street parking lot. <br />• Long-term, station remains at the existing site: This alternative assumes that two sets of train <br />tracks continue to run through downtown and that Sequoia Station is redeveloped, allowing for <br />changes to the street grid, station access, and transit circulation. The scenario recommends <br />enlarging the loop in the above short-term scenario to increase capacity for buses. This would <br />create a larger central open space and improve access and circulation on James Street and to the <br />surrounding businesses. This scenario removes the truck loading areas on James Street and the <br />90 parking spaces in the bus station's surface parking lot. Transit riders could use a new parking <br />structure that is considered for the Perry Street lot or underground parking included with new <br />development. <br />• Long-term, station relocates to the Perry Street site: This scenario is developed with the <br />understanding that more space is needed to accommodate future rail expansion in Redwood City <br />(Caltrain service expansion and/or Dumbarton Rail Corridor). This alternative recommends <br />shifting the Caltrain station and the transit center north to Perry Street. Perry Street is used for <br />bus circulation (closed to personal vehicles) and there are changes to the street grid to improve <br />access and circulation to the transit center. A linear bus station would improve connectivity <br />between the Caltrain platforms and the bus loading/unloading area. This alternative has the <br />advantage of using Arguello Street as the Transportation Network Company ('Uber/Lyft') and <br />shuttle pick-up/drop-off location. <br />Shifting the location would allow redevelopment of the existing transit center. Due to the four <br />sets of railroad tracks, this alternative would require street closures and/or grade separations. <br />The schematic drawings show Broadway being closed at the tracks and Brewster Avenue going <br />under the tracks, but the actual design/approach will be developed in future phases. In the <br />event of any roadway closures, undercrossings would provide connectivity across the tracks for <br />people walking and biking. This alternative requires the removal of all 135 parking spaces at the <br />Perry Street parking lot. Transit passengers who drive to the station would park in a new parking <br />structure built when the existing transit center site is redeveloped. <br />Study Outcomes and Next Steps: The study identified all three alternatives as feasible from a physical site <br />planning and transit operations standpoint. These findings and analyses will inform the upcoming planning <br />work for the Transit District and Central Redwood City visioning process. Those efforts would also evaluate <br />any impacts on traffic circulation due to the proposed changes. Outreach during these planning efforts is <br />needed to gauge the interest in, and support for, the long-term alternatives. <br />While engaging the community about its vision for the transit center and Central Redwood City, staff <br />recommend seeking grant funding and support from Caltrain and San Mateo County Transit District <br />(SamTrans) to implement relatively short-term improvements. Examples include replacing the fence on <br />the Winslow Street side of the Caltrain platform with stairs to increase the ease of accessing the train <br />platform, adding shelters, or improving the quality and quantity of bicycle lockers at the transit center. <br />Page 4 of 10 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />547 <br />
The URL can be used to link to this page
Your browser does not support the video tag.