Laserfiche WebLink
8.B. - Page 3 of 70 <br />agenda item. The studies support the City Council's Strategic Plan and its strategic priority of <br />transportation by improving access to transit and improving transit as a viable transportation option for <br />the community. <br />ANALYSIS <br />Transit Center Redesign Study <br />The Redwood City Transit Center has an average of 4,200 Caltrain and 2,200 bus passengers on weekdays. <br />The Redwood City Caltrain Station has the fifth -highest ridership and fifth -highest bicycle usage in the <br />Caltrain system. The bus station is served by 12 SamTrans routes and about 20% of the current SamTrans <br />passengers go through the Redwood City Transit Center. Attachment A is the summary report for the <br />Transit Center Redesign Study. The complete report is available on the project webpage. <br />Existing Conditions Evaluation: As part of this study, CDM Smith, the project consultant, evaluated the <br />existing access to and functionality of the transit center, pedestrian, bicycle, and traffic circulation, parking <br />use, station amenities, wayfinding features, and linkages to the downtown and adjacent open and public <br />spaces. A summary of the deficiencies are listed below: <br />• Conflicts between pedestrians and buses with the existing configuration of bus bays <br />• Inconvenient at -grade crossings at the ends of the Caltrain platform <br />• Poor relationship between the transit center and the surrounding buildings; all buildings turn <br />their back to the Caltrain and bus stations <br />• Underutilized parking - parking spaces at the underground parking garage and in the Perry Street <br />lot are significantly underutilized; the peak weekday occupancy of these parking facilities is about <br />60 <br />• Inadequate access and wayfinding from EI Camino Real to the transit center <br />• Difficult access to the platform from Winslow Street due to the platform fence <br />• Conflicts between vehicles entering and exiting the underground garage with bicyclists and <br />pedestrians <br />• Insufficient long-term, secure bicycle parking <br />Community Outreach: During the planning process, City staff conducted public and stakeholder outreach <br />in conjunction with other planning projects (RWCmoves and EI Camino Real Corridor Plan) and the <br />Broadway Streetcar Study. Staff also used a survey to get information on how people currently access the <br />transit center and what changes they would like to see. Most respondents stated they get to the station <br />by driving (32%) or walking (26%). In terms of suggested improvements, top responses were better bus <br />connections to more destinations, better sheltered waiting area, clear information about schedules and <br />transfers, and improved pedestrian crossings. <br />Design Alternatives: For this study, three improvement concepts are developed that include short-term <br />and long-term improvements. Below is a summary of the design concepts: <br />• Short-term: The short-term improvement concept suggests creating a counter -clockwise <br />circulation loop for buses and changing the existing bus bays to saw tooth bays. This would <br />improve passenger loading and unloading activities, reduce conflicts between buses and <br />Page 3 of 10 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />546 <br />