My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt20 Star ELevator, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2020
>
Agmt20 Star ELevator, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2022 9:50:11 AM
Creation date
1/28/2020 2:24:05 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Star ELevator, Inc.
PROJECT NAME
General and preventative maintenance of elevators and lifts
RMP File Number
304
Date
1/24/2020
MO Ref
19-204
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
impractical to determine in the event of such failure or delay, Contractor agrees that it shall be <br />liable for and pay to the City liquidated damages of Two Hundred dollars ($200.00) for each <br />thirty (30) minute delay beyond the acceptable response time. Contractor agrees to pay said <br />liquidated damages as herein provided, and in case the same are not paid, agrees that City may <br />deduct the amount thereof from monies due or that may become due to the Contractor. <br />2. In the event of non -emergency calls during business hours, the Contractor shall provide service <br />within three (3) hours of placement of the call by the City. Upon approval by the Facilities <br />Manager, additional time may be allowed. If the call comes in during nonbusiness hours, the <br />Contractor shall respond by 10:00 a.m. the next business day. Since the determination of actual <br />damages for any failure or delay in performance of this requirement would be extremely <br />difficult or impractical to determine in the event of such failure or delay, Contractor agrees that <br />it shall be liable for and pay to the City liquidated damages of One Hundred dollars ($100.00) <br />for each eight (8) hour delay beyond the allowed time. Contractor agrees to pay said liquidated <br />damages as herein provided, and in case the same are not paid, agrees that City may deduct the <br />amount thereof from monies due or that may become due to the Contractor. <br />3. All elevator service personnel responding to service requests or emergency calls shall contact <br />Facilities Staff upon arrival at the facility. The check in procedure shall be to call the Facilities <br />Help Line at (650) 780-7473 during business hours, or for after hour emergencies to call <br />Communications at (650) 780-7118 and request that they notify a Facilities Maintenance staff <br />person. <br />1. Schedules and Records <br />1. Contractors shall submit preventative maintenance work schedules to the City. These work <br />schedules shall be designed for each type of equipment to be serviced, such as traction elevators <br />or hydraulic elevators, and shall conform to the manufacturer's recommended practice for the <br />particular equipment concerned. The schedules shall also show the type and frequency of <br />service and lubrication proposed by the Contractor for a one (1) year duration. The City will <br />evaluate and approve the proposed maintenance schedules before the work may commence. <br />2. All inspections, lubrication, adjustments, tests, cleaning, routine repairs, and other preventative <br />maintenance activities shall be performed in accordance with the approved maintenance <br />schedules. <br />3. The Contractor shall keep these work schedules on display in each equipment room. Schedules <br />posted shall be of the chart type, which shall be initialed by the service person when each <br />scheduled inspection is performed. <br />4. Contractor agrees to provide an activity log in a permanently bound journal having pre - <br />numbered pages and to keep the log current. The log is to be kept in the machine room and <br />available for review by City. The activity log is the property of the City. The activity log will <br />be complementary to the maintenance and lubrication logs. Entries will identify who from the <br />Contractor's organization was in the building, during what period of time, and for what purpose <br />(e.g. regular maintenance, regular time call-back, overtime call-back, etc.). Equipment failures, <br />REV: 11-27-19 EI <br />
The URL can be used to link to this page
Your browser does not support the video tag.