Laserfiche WebLink
REV: 12-22-2021 RL <br />797 Redwood Shores Parkway <br />Courthouse Square (Lift) <br />2200 Broadway <br />$242.09 <br />Total Cost $4,634.24 <br />2. Work Performed After Regular Working Hours <br />For work performed outside of regular working hours, Contractor will be paid on an hourly basis <br />based on the labor rates delineated in the chart below. <br />ITEM OVERTIME <br />RATE (1) <br />DOUBLE TIME <br />RATE (2) <br />Elevator Mechanic $619.00 $696.00 <br />Repair Crew $1,289.00 (3) $1,289.00 <br />(1) Weekdays (outside of regular working hours) and Saturdays. <br />(2) Sundays and Holidays. <br />(3) Repair crews are billed at double time for all work outside of regular working hours. <br />ATTY/AGR.Amend No. 2/Star Elevator, Inc. (Page 5 of 5)