My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-02-10 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-02-10 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 11:31:49 AM
Creation date
2/7/2020 2:47:27 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/10/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.E. - Page 48 of 70 <br />Deliverables: <br />• Peer review memoranda for each of the technical studies indicating the adequacy of <br />the study for use in the CEQA documents and identifying any additional <br />information/analyses that may be necessary. <br />Task 3: Initial Study (IS) and Notice of Preparation (NOP) <br />Following approval of the Project Description under Task 1, AECOM will prepare a <br />Draft IS for review by the City, and will then incorporate City comments into a Final IS. <br />The document will be prepared pursuant to CEQA and the CEQA Guidelines, <br />particularly Appendices G and F. All 17 required environmental factors identified in <br />CEQA Guidelines Appendix G, as modified by the City, will be evaluated in the IS. <br />Each factor will contain a brief setting discussion to provide context and background for <br />the following impact analysis, which will respond to the Appendix G checklist <br />questions. Substantial evidence will be provided to support significance conclusions in <br />the IS. The City's EI Camino Corridor Plan, the General Plan, the Downtown Precise <br />Plan, site visits, other relevant EIRs, and local and regional databases and inventories <br />will be used to support the analyses in the 1S. In conjunction with the Final IS, an NOP <br />will be prepared. <br />AECOM will respond to one round of consolidated City and applicant comments on the <br />draft 1S. Up to 15 color and black and white graphics will be prepared and incorporated <br />into the 1S and will primarily present the project location and describe the project— site <br />plan, building elevations and massing, on- and off-site circulation and utility <br />improvements, and landscaping concepts. Other figures will identify the applicable <br />General Plan land use designations and zoning districts, illustrate the surrounding visual <br />setting (photographic documentation), and location of noise measurements from the <br />applicant's noise study. <br />Page 15 of 37 <br />ATTY/AGR/2018.270/AECOM PSA <br />REV: 12-07-18 PR <br />111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.