My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-02-10 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-02-10 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 11:31:49 AM
Creation date
2/7/2020 2:47:27 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/10/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.E. - Page 49 of 70 <br />Finally, the transportation analysis will present the street network (including existing and <br />planned pedestrian and bicycle improvements), the study intersections, and existing / <br />existing plus project intersection AM/PM volumes. Technical studies provided by the <br />project applicant that address hazardous materials, noise, trees, and historic <br />resources will be incorporated into the Initial Study. If available and applicable, the City <br />will provide a Water Supply Assessment per SB 610 requirements. <br />The City will be responsible for NOP distribution to interested parties, however, AECOM <br />will file the NOP and the IS with the State Clearinghouse and conduct all agency <br />noticing. The IS will provide sufficient information to avoid the need for further <br />environmental review for all topics, except for those for which there may be significant <br />and unavoidable impacts or areas of potential controversy. Based on the community <br />surveys undertaken by the project applicant, potential impacts that may be addressed <br />in the EIR include aesthetics/visual quality, and transportation, as discussed further <br />below under Task 4. <br />Deliverables: <br />• Draft IS (for City review), submitted electronically as an MSWord file. <br />• Screencheck Final IS (for City approval to print), submitted electronically as a PDF file. <br />• Final IS (for inclusion with NOP), submitted as two hard copies and one electronic <br />copy in pdf to the City. An additional 15 hard copies can be produced for the State <br />Clearinghouse. <br />• Draft and Final NOP, submitted to the City electronically as an MSWord file and pdf <br />file, respectively, as well as one hard copy to be filed with the State Clearinghouse. <br />Task 4: Draft Focused EIR <br />AECOM will prepare an Administrative Draft Focused EIR for review by the City, a <br />Screencheck Draft Focused EIR for final approval by the City, and a Public Draft <br />Focused EIR for publication. Pertinent comments received in response to the NOP will <br />be addressed as part of the analysis. <br />Page 16 of 37 <br />ATTY/AGR/2018.270/AECOM PSA <br />REV: 12-07-18 PR <br />112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.