My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-02-24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-02-24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 11:28:52 AM
Creation date
2/20/2020 5:56:17 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/20/2020
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
2/20/2020 5:58 PM
Modified:
2/20/2020 5:58 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.H. - Page 2 of 24 <br />occurs by running hot water down the drain and pouring FOG in with it. As FOG travels through the sewer <br />conveyance system, it inevitably cools, takes a solid form, and sticks to sewer pipe walls. <br />As FOG accumulates on pipe walls, the flow of wastewater becomes restricted and a blockage is created. <br />These conditions lead to sanitary sewer overflows that may leak into stormwater system and discharge <br />into creeks and the Bay. When this occurs, an emergency response unit is dispatched to eliminate blockages <br />and address overflows. Additionally, this results in regulatory compliance issues with the State Water <br />Resources Control Board, as well as associated fines and potential claims against the City. These additional <br />costs are ultimately absorbed through increased sewer bills to property owners and insurance premiums <br />to the City. To address this recurring issue, staff proposes to update a FOG section within the existing <br />Sanitary Sewer Ordinance. While the City's plumbing code addresses grease traps and interceptors, the <br />proposed FOG section update would not result in any changes to current plumbing code requirements. <br />ANALYSIS <br />On February 10, 2020, the Council introduced an ordinance amending Chapter 27 of the Municipal Code <br />adding a fats, oils and grease program, as well as enforcement penalties. If adopted, this Ordinance would <br />take effect 30 days from adoption. However, requirements would have a two-year amnesty period in which <br />City staff and SVCW would work with FSEs to reach compliance without any penalties. The proposed <br />Ordinance would take effect on March 25, 2020, with a two-year amnesty period ending on March 25, <br />2022. <br />FISCAL IMPACT <br />Funding for FOG inspections is already included in the Joint Powers Authority agreement with SVCW. No <br />additional costs are anticipated. <br />ENVIRONMENTAL REVIEW <br />This activity is not a project under California Environmental Quality Act (CEQA) as defined in CEQA <br />Guidelines, section 15378, because it is an administrative activity. Even if the Ordinance were to be <br />considered a project, it would be categorically exempt pursuant to CEQA Guidelines, Section 15308, <br />because it sets forth regulations to prevent FOG from entering the City's sewerage system and waterways. <br />PUBLIC NOTICE <br />Public notification was achieved by posting the agenda, with the agenda items being listed, at least 72 <br />hours prior to the meeting. <br />Page 2 of 3 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />163 <br />
The URL can be used to link to this page
Your browser does not support the video tag.