Laserfiche WebLink
6.D. - Page 15 of 50 <br />REV: 06-15-18 VR <br />Page 11 of 14 <br />ATTY/AGR/2018.128/ELS ARCHITECTURE & URBAN DESIGN <br />56, <br />ELS Consultants <br />ELS basic services include the work <br />of the following consultants for the Veterans <br />Memorial Building, East Parking Lot and Promenade: <br />1. <br />Interior Design: <br />ELS + Jan Edson Design <br />2. <br />Landscape Architect: <br />SWA <br />3. <br />Civil Engineer: <br />Sandis <br />4. <br />Structural Engineer: <br />Forell/Elsesser Engineers <br />5. <br />Mechanical, Electrical, Plumbing and <br />Low Voltage Engineers: <br />Integral Group <br />6. <br />LEED: <br />Integral Group <br />7. <br />Theater and Audio/Visual Systems: <br />The Shalleck Collaborative <br />8. <br />Acoustics: <br />Charles M. Salter Associates <br />9. <br />Life Safety (Code): <br />The Preview Group <br />10. <br />Elevator: <br />Syska Hennessy Group <br />11. <br />Building Envelope: <br />SGH <br />12. <br />Specifications: <br />Topflight Specs <br />13. <br />Cost Estimating: <br />Mack5 <br />14. <br />Lighting Design: <br />EOS Lightmedia <br />15. <br />Kitchen/Food Service: <br />Muller Design <br />16. <br />Exhibit Designer: <br />CambridgeSeven <br />17. <br />Signage and Graphics: <br />CambridgeSeven <br />ELS basic services include the work of the following consultants for related Traffic <br />Calming Measures: <br />i <br />Traffic Calming Solutions — Final Community Workshops Blue Zones with Dan Burden <br />2 <br />Traffic and Mobility Engineering: Toole Design Group <br />3. <br />Landscape Architect: SWA <br />REV: 06-15-18 VR <br />Page 11 of 14 <br />ATTY/AGR/2018.128/ELS ARCHITECTURE & URBAN DESIGN <br />56, <br />