My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-03-09 Joint
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-03-09 Joint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 11:25:10 AM
Creation date
3/5/2020 4:04:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.D. - Page 93 of 108 <br />Flow -Through Planter Maintenance Plan for <br />353 Main Street <br />Flow-through planters are designed to treat and <br />temporarily detain runoff without allowing <br />seepage into the underlying soil. They typically <br />receive runoff via downspouts leading from the <br />roofs of adjacent buildings. <br />Project Address and Cross Street: <br />353 Main Street, Bounded by Veterans Blvd <br />Assessor's Parcel No.: 052-38-3370 <br />Property Owner: 353 Main Street Apartments, <br />LP <br />Phone No.: 408-984-5600 <br />Designated Contact: Drew Walstrum <br />Phone No.: 408-984-5600 <br />Mailing Address 1650 Lafayette Street, Santa Clara, <br />CA 95050 <br />The property contains six (6) Flow -Through Planters, located as described below and as <br />shown in the attached site plan: <br />Flow-through Planter Area No. 1A - <br />F is located: <br />Flow-through Planter Area No. 1 B- <br />F is located: <br />Flow-through Planter Area No. 1C - <br />F is located: <br />Flow-through Planter Area No. 1 D- <br />F is located: <br />Flow-through Planter Area No. 1E - <br />F is located: <br />Flow-through Planter Area No. 1 F- <br />F is located: <br />3rd floor on the podium deck of the building <br />3rd floor on the podium deck of the building <br />3rd floor on the podium deck of the building <br />3rd floor on the podium deck of the building <br />3rd floor on the podium deck of the building <br />3rd floor on the podium deck of the building <br />i. Routine Maintenance Activities <br />The principal maintenance objectives are to ensure that water flows unimpeded into the <br />flow-through planter and landscaping remains attractive in appearance. Table 1 shows the <br />routine maintenance activities, and the frequency at which they will be conducted. <br />Table 1 <br />Routine Maintenance Activities for Flow -Through Planters <br />No. <br />Maintenance Task <br />Frequency of Task <br />1 <br />Evaluate health of trees and groundcover. Remove and replace all dead <br />Twice a year <br />and diseased vegetation. Treat vegetation using preventative and low -toxic <br />methods. <br />2 <br />Maintain vegetation and the irrigation system. Prune and weed to keep flow- <br />As needed <br />through planter neat and orderly in appearance. <br />3 <br />Check that mulch is at appropriate depth (3 inches per soil specifications) <br />Monthly <br />and replenish as necessary. <br />K,w&ni nsWm QLJVaPPcoan, Ih,, PJi 62,d" Page i <br />NDS Approved 1215107 <br />ATTYIAGR.2019.317iwoodside Professional Center, LLC (Page 19 of 29) 231 <br />
The URL can be used to link to this page
Your browser does not support the video tag.