Laserfiche WebLink
6.D. - Page 94 of 108 <br />4 <br />Check that soil is at appropriate depth. Till or replace soil as necessary to <br />Before wet season and as <br />maintain a minimum of 6 inches between top of mulch and overflow weir. <br />necessary <br />5 <br />Remove accumulated sediment, litter and debris from flow-through planter <br />Before wet season and as <br />and dispose of properly. Confirm that no clogging will occur and that the box <br />necessary <br />will drain within three to four hours. <br />6 <br />Inspect flow-through planter to ensure that there are no clogs. Test with <br />Monthly during the wet season, <br />garden hose to confirm that the planter will drain within three to four hours. <br />and as needed after storm <br />events <br />7 <br />Inspect downspouts from rooftops and sheet flow from paved areas to <br />Monthly during the wet season, <br />ensure flow to planter box is unimpeded. Remove debris and repair <br />and as needed after storm <br />damaged pipes. Check splash blocks or rocks and repair, replace and <br />events <br />replenish as necessary. <br />x,w a. ar nye,Bunn,iwsnipn�o3no-m�n�m�,ia�r,z.e�� Page 2 NDS Approved 1215/07 <br />ATTYIAGR.2019.3171Woodside Professional Center, LLC (Page 20 of 29) 232 <br />