My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-03-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-03-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2020 3:06:56 PM
Creation date
3/23/2020 10:46:21 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/23/2020
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
3/23/2020 10:47 AM
Modified:
3/23/2020 10:47 AM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
S.B. - Page 2 of 4 <br />standard street improvements. The design includes two bio -retention areas and an infiltration trench that <br />will both capture and treat the storm water for up to a 5 -year storm event. For the larger storm events a <br />valley gutter will be installed along Oakwood Drive that ultimately directs the excess water to the storm <br />water system in EI Camino Real. <br />ANALYSIS <br />The project generally consists of the following improvements: <br />• Concrete curb and gutter <br />• Concrete valley gutter <br />• Bio -retention Areas and Infiltration Trenches <br />• Grading and pavement restoration <br />The four bids received at the bid opening on February 19th, 2020 are summarized in the table below: <br />Bidder <br />Bid Amount <br />1 Grade Tech, Inc. <br />$317,485.60 <br />2 Stoloski & Gonzalez, Inc. <br />$328,523.50 <br />3 Czardo Construction Inc. <br />$336,294.00 <br />4 Sposeto Engineering, Inc. <br />$553,683.00 <br />Engineer's Estimate <br />$248,650.00 to $273,510.00 <br />The low bid of $317,485.60 submitted by Grade Tech, Inc. is 16.1 percent higher than the Engineer's <br />estimate of $273,510.00. Staff recommends awarding the contract to Grade Tech, Inc. as they are the <br />lowest responsive and responsible bidder. The contract is based on the City's standard form construction <br />agreement with limited revisions. <br />Construction is expected to begin in April 2020 and conclude within 45 calendar days. The contractor will <br />provide additional construction notification to the affected residents. <br />FISCAL IMPACT <br />Funding for this project was included in the Capital Improvement Program Budget for Fiscal Year 2019- <br />2020 under the Substandard Street Improvement Program Fund along with a balance $18,465.02 from <br />the Green Infrastructure Pilot Project Fund. <br />ENVIRONMENTAL REVIEW <br />The project is categorically exempt from the requirements of the California Environmental Quality Act <br />(CEQA) Guidelines per Section 15301 (Existing Facilities) because the project would involve minor <br />alterations to existing streets in a manner that does not involve any expansion of use, and 15303 (New <br />Page 2 of 3 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.