My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-05-18 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-05-18 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 9:53:00 AM
Creation date
5/14/2020 4:26:47 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
5/18/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 20 of 28 <br />preferred concept adding detail and granularity around station facilities, intermodal integration <br />and circulation. This work will also include refinement and expansion of urban design work <br />supported by further conceptual engineering as needed. Phase II will culminate in a decision <br />by the City, JPB and District on a preferred station concept layout in downtown Redwood City. <br />This decision will be supported by public and stakeholder outreach throughout the Phase II <br />process. <br />Goals <br />Develop and select a preferred intermodal station concept layout in Redwood City that <br />supports the long-range transit service, infrastructure, and land use needs of JPB, District, <br />and the City. <br />Outcomes <br />Phase 0 <br />• A matrix of rail service options for implementation of the Caltrain Service Vision and <br />Dumbarton Corridor service in and around Redwood City <br />• Highly conceptual (footprint) engineering of the rail infrastructure for up to three options <br />• An assessment of the options based on key outcomes regarding anticipated service <br />levels, ridership impacts, service quality, conceptual property impacts, and other high- <br />level factors <br />• An initial set of spatial parameters to inform potential land use and development planning <br />in the immediate station area <br />• Selection of up to three conceptual service and infrastructure options for further analysis <br />Phase I <br />• A set of "preliminary station concepts" that considers: <br />• Station elevation and relationship to adjoining at -grade crossings <br />o Platform configuration (including both Caltrain and Dumbarton Rail) <br />• Sizing, location and configuration of bus facilities <br />• Circulation and relationship of station elements to local streets, bus, bicycle and <br />pedestrian networks <br />• Station massing and basic (non -architectural) visualization of key urban design <br />features <br />• Conceptual property impacts and relationship of station concepts to surrounding <br />development <br />• Agreement on a preferred preliminary concept for station location and configuration <br />Phase 11 <br />• Conceptual cost estimates and initial funding plan <br />• Project delivery strategy, including schedule, phasing, construction options, environmental <br />clearance strategy <br />REV: 05-07-2020 PR <br />ATTYIAGR.2020.071/SMCTA and JPB (Page 15 of 23) 183 <br />
The URL can be used to link to this page
Your browser does not support the video tag.