Laserfiche WebLink
6.D. - Page 3 of 4 <br />ENVIRONMENTAL REVIEW <br />As the lead agency, City of Redwood City has determined that the Redwood Creek Revetment Project at <br />Bradford Street meets the California Environmental Quality Act (CEQA) exemption criteria as set forth in <br />Section 15302, "Replacement or Reconstruction," because the project would be a replacement of the <br />existing creek revetment at the same location and will have substantially the same purpose and capacity <br />as the revetment replaced. Furthermore, this project is designed to be compliant with the City's <br />Engineering Standards and currently accepted practices. <br />PUBLIC NOTICE <br />Public notification was achieved by posting the agenda, with the agenda items being listed, at least 72 <br />hours prior to the meeting. <br />ALTERNATIVES <br />The City Council may choose not to award the contract and direct staff to redesign and/or rebid this <br />project. <br />ATTACHMENTS <br />Attachment A — Project Location Map <br />REPORT PREPARED BY: <br />Alex Chan, Assistant Engineer II <br />achan@redwoodcity.org <br />(650) 780-7307 <br />APPROVED BY: <br />Mark Muenzer, Community Development & Transportation Director <br />Melissa Stevenson Diaz, City Manager <br />Page 3 of 3 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />