My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-06-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-06-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 9:41:37 AM
Creation date
6/18/2020 5:21:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
6/22/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
624
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.H. - Page 15 of 24 <br />EXHIBIT "A" <br />SCOPE OF SERVICES <br />KEY PERSONNEL <br />Dr. Scott Thomas — Principal Scientist in Charge <br />Jeff Cooley — Project Manager <br />TASK 1 - RISK AND RESILIENCE ASSESSMENT (RRA) <br />1_1 — Project Management <br />ATTACHMENT A <br />Consultant shall hold a Kick -Off Meeting with City staff to discuss scope, schedule, and <br />project details. The Kick -Off Meeting shall ensure City's goals and objectives of the <br />project are clearly understood by the Consultant. Progress meetings and invoicing will be <br />scheduled. Data Management and Quality Control policies will be established and <br />approved. Dr. Scott Thomas, Consultant's Principal Scientist in Charge, will be <br />responsible for every aspect of the work and will provide direction and quality control <br />throughout each phase. The Consultant's Project Manager, Jeff Cooley, shall lead and <br />monitor the project in a clear and proactive manner according to the following policies <br />and options: <br />Cost Control <br />Cost control begins early in the project. Consultant shall ensure that City objectives and <br />expectations are clear and communicated to all team members. Senior technical experts <br />shall be involved in the process early to evaluate budget, staffing, and time constraints. <br />In addition, early involvement of the technical staff shall ensure that project objectives <br />and constraints are incorporated into and carried through the project planning and <br />implementation processes. <br />Data Security <br />Consultant's computing infrastructure shall be geared towards security as the core of its <br />operations, utilizing a full spread of System -level, Network -level, and Organization -level <br />planned and managed enterprise -class software and hardware solutions. Cybersecurity <br />shall be built from the ground up with anti-virus, encrypted firewalls and VPNs, well- <br />defined password policies, and security training for everyone within the organization. <br />Project -level IT shall require a greater focus on data and hardware used in the field by <br />professionals and partners. The following measures shall be taken for the hardware and <br />software levels: <br />All hardware shall be tightly controlled with remote monitoring and system wipe <br />implementations as needed. Project laptops and desktops shall have Multi -Factor <br />Authentication utilizing a complex password, pushed authentication to mobile devices, <br />and Biometric Authentication. <br />Project data shall be provisioned on the Microsoft SharePoint Online platform. City data <br />shall only be accessible via a secured terminal server within an isolated Microsoft Azure <br />REV: 06-04-2020 MI <br />ATTY/AGR.2020.088/ARRC Consultants, LLC (Page 12 of 20) 202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.