My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-06-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-06-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 9:41:37 AM
Creation date
6/18/2020 5:21:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
6/22/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
624
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1. - Page 26 of 52 <br />The City is responsible for marking trees so that they are easily identifiable by Underground <br />Service Alert and the Contractor. The Contractor shall be required to call Underground <br />Service Alert (USA) at least 2 days before stumps are to be ground out. All tree stumps <br />must be removed to at least 18 inches below the lowest soil level adjacent to the stump, <br />or until deep roots are no longer encountered. The Contractor shall grind the stump a <br />minimum distance of one and a half (1%') feet either side of the outer circumference of the <br />stump, or until surface roots are no longer encountered. <br />Stumps should be cut low enough to the ground where routing can be done safely. This <br />may be accomplished by cutting the stump at the time of grinding, or at the time of tree <br />removal except for infrastructure conflicts. Holes created by stump and root grinding must <br />be filled the same day. The resultant chips from routing may be used to fill the hole to two <br />(2") inches above normal ground level. All excess routing chips debris will be removed and <br />loaded into transport vehicle for disposal. Any damaged paved surfaces shall be restored <br />to their original condition. <br />vii. Tree Planting <br />City to supply trees, stakes and ties; Contractor crew provides only planting and <br />installation. Planting lists should be compiled and submitted monthly or as needed. <br />Contractor will guarantee the quality of the installation workmanship. <br />a. Contractor shall provide all equipment, labor and materials necessary for the planting <br />of trees throughout the City in accordance with the specifications herein. <br />b. The City shall be responsible for marking locations and will notify Underground Service <br />Alert (USA) prior to planting. <br />c. Planting pit shall be dug twice the width and the same depth of the root ball. Before <br />placing the tree in the planting pit Contractor shall examine root ball for injured roots <br />and canopy for broken branches. Damaged roots should be cleanly cut off at a point <br />just in front of the break. Broken branches should be cut out of the canopy making <br />sure that the branch collar is not damaged. <br />d. Tree shall be placed in the planting pit with its original growing level (the trunk flare) <br />at the same height of the surrounding finish grade. The top of the root ball shall be <br />level or slightly higher than the surrounding soil. <br />e. Backfill material should be native soil. Eliminate all air pockets while backfilling the <br />planting pit by watering the soil as it's put into the hole. <br />f. Trees that are planted in parkways shall have a V-6" high water retention basin built <br />around the tree capable of holding at least ten (10) gallons of water. In a concrete tree <br />well, soil should be raked against the edge of the concrete to create a sloping basin. <br />Immediately after planting, the tree shall be watered thoroughly by filling the water <br />retention basin twice. <br />PUBLIC WORKS SERVICES DEPARTMENT <br />FY 2019-20 RFP FOR COMPREHENSIVE STREET TREE MAINTENANCE SERVICES <br />12 OF 37 <br />237 <br />
The URL can be used to link to this page
Your browser does not support the video tag.