Laserfiche WebLink
6.1. - Page 27 of 52 <br />g. All trees shall be staked with two wooden lodge poles and two ties per pole. Minimum <br />size of lodge poles shall be eight (8') feet long, with a one and a half (1%") inch <br />diameter. Tree ties shall be placed at one third (%") and two-thirds (2/3) of the trunk <br />height. Stakes shall not penetrate the root ball and shall be driven into the ground <br />approximately twenty-four to thirty (24"-30") inches below grade. <br />h. Clean up all trash and any soil or dirt spilled on any paved surface at the end of each <br />working day. <br />viii. Stump Removal <br />Contractor crew grinds stumps to a depth of eighteen (18") inches. All holes will be <br />backfilled; as well as all debris cleaned up and hauled away. <br />The City is responsible for marking trees so that they are easily identifiable by Underground <br />Service Alert and the Contractor. The Contractor shall be required to call Underground <br />Alert at least 2 days before stumps are to be ground out. All tree stumps must be removed <br />to at least 18 inches below the lowest soil level adjacent to the stump, or until deep roots <br />are no longer encountered. The Contractor shall grind the stump a minimum distance of <br />one and a half (1%') feet either side of the outer circumference of the stump, or until <br />surface roots are no longer encountered. <br />Stumps should be cut low enough to the ground where routing can be done safely. This <br />may be accomplished by cutting the stump at the time of grinding, or at the time of tree <br />removal except for infrastructure conflicts. Holes created by stump and root grinding must <br />be filled the same day. The resultant chips from routing may be used to fill the hole to two <br />(2") inches above normal ground level. All excess routing chips debris will be removed and <br />loaded into transport vehicle for disposal. Any damaged paved surfaces shall be restored <br />to their original condition. <br />ix. Emergency Response <br />The Contractor shall be required to provide emergency on call response for damaged trees <br />as a result of storms or other reasons. Emergency calls may occur at any given time. The <br />Contractor will be provided with locations and the work to be done at each location via <br />telephone from a City authorized representative. Emergency work shall begin within two <br />(2) hours of the initial telephone call. <br />Contractor shall be required to provide a twenty-four (24) hour emergency phone number <br />or the names of at least ten (10) contact individuals upon award of contract. Should the <br />contact persons or their phone numbers change during the course of the contract, those <br />changes shall be submitted to the City within two (2) working days. <br />PUBLIC WORKS SERVICES DEPARTMENT <br />FY 2019-20 RFP FOR COMPREHENSIVE STREET TREE MAINTENANCE SERVICES <br />13 OF 37 <br />238 <br />