Laserfiche WebLink
6.1. - Page 29 of 52 <br />F. Quality Control Plan <br />Contractor should have a Quality Control Plan with an effective and efficient means of <br />identifying and correcting problems for the entire scope of operations and Term of the contract. <br />The successful Contractor shall be required to comply with this quality control throughout the <br />term of the contract. Contractors shall have a current Safety Manual that meets SB 198 <br />requirements for injury and illness prevention. <br />G. Clean -Up <br />Contractor shall clean all job sites when work is completed, including the raking of leaves, twigs, <br />etc. from the lawns and parkways and the sweeping of streets. <br />Each day's scheduled work shall be completed and cleaned up and under no circumstances shall <br />any brush, leaves, debris or equipment be left on the street overnight. <br />The City's Tree Maintenance Leader and/or other authorized City staff shall be the sole judge <br />as to the adequacy of the clean-up. <br />H. Inspections <br />The City's Tree Maintenance Leader and/or other authorized City staff, shall, at all times, have <br />access to the work and shall be furnished with every reasonable facility for ascertaining full <br />knowledge respecting the progress, workmanship, and character of materials and equipment <br />used and employed in the work. <br />I. Minor Modifications and/or Additional Work <br />i. The City may modify these specifications with the joint approval of the Contractor and the <br />City of Redwood City. All modifications shall be in writing. <br />ii. In the event that the City of Redwood City should require additional work beyond the <br />requirements of these specifications, the Contractor shall perform all work at a <br />competitive price. <br />iii. Additional work may be added to the contract work as the need arises. The Contractor <br />shall perform all specified and approved additional work at the unit prices submitted with <br />this proposal. <br />iv. The Contractor must be willing to provide a competitive price for additional work that may <br />be added to the contract. Contractor will be required to demonstrate the ability to <br />properly execute the expanded workload with the necessary increase in labor, materials <br />and equipment needed to complete the additional work in a timely manner. <br />PUBLIC WORKS SERVICES DEPARTMENT <br />FY 2019-20 RFP FOR COMPREHENSIVE STREET TREE MAINTENANCE SERVICES <br />15 OF 37 <br />240 <br />