My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-07-27 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-07-27 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 9:17:58 AM
Creation date
7/27/2020 12:50:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
7/27/2020
Text box
ID:
1
Creator:
Created:
7/27/2020 12:51 PM
Modified:
7/27/2020 12:51 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.D. - Page 1 of 4 <br />/<�ik <br />Redwood <br />CitylCallifornia <br />Faunded 1867 <br />A,&/ <br />DATE: July 27, 2020 <br />SUBJECT <br />STAFF REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br />Award of Contract for 2019 Overlay Project (Portions of Chestnut Street, Middlefield Road, and Spring <br />Street) <br />RECOMMENDATION <br />By motion, approve and authorize the City Manager to execute the standard form construction contract <br />documents and award a contract for the 2019 Overlay Project (portions of Chestnut Street, Middlefield <br />Road, and Spring Street) to the lowest responsible bidder, G. Bortolotto & Co., Inc. of San Carlos, for their <br />low bid of $521,111.11; and authorize the City Manager, or their designee, to increase the contract <br />amount, if necessary, up to 10% of the original contract amount, for a not to exceed total in the amount <br />of $573,222.22. <br />STRATEGIC PLAN GUIDING PRINCIPLE <br />Transportation <br />BACKGROUND <br />Roadway pavements require repair and preventive maintenance for a variety of reasons, including <br />deterioration due to aging, traffic loads, exposure to the elements, and intrusive tree roots. The Roadway <br />Management Program inventories, assesses, and tracks maintenance of the City's roadways. Roadway <br />segments are then prioritized for resurfacing based on the needs of the entire street network. It is more <br />economical to preserve pavements in good condition rather than delaying repairs, because as they age <br />pavements deteriorate faster and associated repair costs increase rapidly. <br />Each year, projects are selected to optimize pavement conditions and to make the most efficient use of <br />limited resources. The purpose of this project is to preserve and extend the serviceable life of the streets <br />Page 1 of 3 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.