My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt20 AARC Consultants LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2020
>
Agmt20 AARC Consultants LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 9:26:50 AM
Creation date
8/12/2020 12:46:12 PM
Metadata
Fields
Template:
Agreement
Contractor Name
AARC Consultants, LLC
PROJECT NAME
Consultant to Risk and Resilience assesment and update to water system emergency response plan
RMP File Number
304
Date
7/3/2020
MO Ref
20-095
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
environment, ensuring confidentiality. <br />Quality Assurance / Quality Control (QA/QC) <br />The Consultant's Project Manager (PM) shall ensure that stringent quality procedures are <br />performed. QA/QC shall also incorporate a general review of personnel to ensure an <br />acceptable level of expertise is maintained for quality products. Deliverables prepared <br />under this contract shall be subjected to three levels of review: <br />Level 1: Deliverables shall undergo a detailed review by the PM and Technical Leads to <br />ensure that the documents are technically accurate, consistent, clear, and actionable. <br />Level 2: Deliverables shall be reviewed by the Technical Editor for grammar, clarity, and <br />formatting. <br />Level 3: Deliverables shall be reviewed by the Principal in Charge prior to submission. <br />The PM shall conduct periodic meetings with City staff (in-person and conference call or <br />webinar) to review project status, discuss analysis results, and plan next steps. <br />Consultant shall continuously check in with the United States Environmental Protection <br />Agency (US EPA) for any American Water Infrastructure Act (AWIA) requirement <br />changes or updates and shall utilize any such information to complete the RRA and <br />Emergency Response Plan (ERP). Overall project management shall ensure all tasks are <br />fully completed and within the allocated budget and timeframe. <br />Risk Analysis Software <br />Consultant may employ a number of tools for performing the RRA analysis. Consultant <br />has experience with the non-proprietary, USEPA-developed Vulnerability Self - <br />Assessment Tool (VSAT), the proprietary Program to Assist Risk and Resilience <br />Examination (PARRS), and Consultant's own Risk and Resilience Analytic Tool (ARRT). <br />VSAT Web 2.0 is an "approachable" tool designed for non -specialists. VSAT would <br />enable City staff to perform self- evaluations to remain compliant with AWIA. However, <br />VSAT has limitations that shall be discussed with City staff. <br />The more sophisticated Program to Assist Risk and Resilience Examination (PARRE) is <br />a proprietary software package with yearly fees (—$500/user/year) and a steeper learning <br />curve. Proprietary tools can be very powerful; however, they require ongoing investment <br />of time and money as well as specialized knowledge to employ in managing risk and <br />resilience. <br />AARC has developed a tool (ARRT) that is more flexible, customized, and client -oriented <br />than VSAT and PARRE, and this option shall also be discussed with the City. <br />REV: 06-04-2020 MI <br />ATTY/AGR.2020.088/ARRC Consultants, LLC (Page 13 of 20) <br />
The URL can be used to link to this page
Your browser does not support the video tag.