My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-09-21 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-09-21 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 6:18:07 PM
Creation date
9/17/2020 6:17:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/21/2020
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
9/17/2020 6:18 PM
Modified:
9/17/2020 6:18 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.B. - Page 2 of 7 <br />The original contract issued in 2019 was based on staff's best estimate of earth disturbing activities before <br />the construction started. The actual site excavation and grading schedule has proved to be more complex, <br />expansive, and prolonged than expected. This amendment is necessary to perform all air sampling work <br />to monitor the earth disturbing activities. Approximately 100 working days of monitoring is added to the <br />original SCA's scope of work to adequately cover the remaining on-going earth disturbing activities at the <br />site. Staff continues to work with Anderson Pacific, the general contractor performing the California Tank <br />construction, to reduce the number of construction days that involve earth disturbing construction <br />activities. <br />FISCAL IMPACT <br />Funds for this project were appropriated under the Fiscal Year 2019-2020 Water Fund Capital Projects - <br />California Tank, Pump Station, and Generator. The project account has an available balance of <br />$898,486.44 as of June 30, 2020. No additional funds are required. <br />ENVIRONMENTAL REVIEW <br />This activity is not a project under California Environmental Quality Act (CEQA) as defined in CEQA <br />Guidelines, section 15378, because it has no potential for resulting in either a direct or reasonably <br />foreseeable indirect physical change in the environment. On May 8, 2017, the City Council certified an <br />Environmental Impact Report for the California Water Tank, Pump Station and Transmission Main Project. <br />PUBLIC NOTICE <br />Public Notification was achieved by posting the agenda, with the agenda items being listed, at least 72 <br />hours prior to the meeting <br />ALTERNATIVES <br />The City Council may choose not to approve the amendment, however, this would be contrary to previous <br />City Council action. Fence line perimeter monitoring is required by the Bay Area Air Quality Control Board <br />for this project. The project construction will have to be stopped if monitoring would not be provided. <br />Stopping the unfinished construction at this time will have significant negative impacts to the environment <br />at and around the site, the potable water system services, and the construction contract. <br />ATTACHMENTS <br />Attachment A — Amendment No. 1 to Professional Services Agreement <br />Page 2 of 3 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.