My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-09-21 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-09-21 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 6:18:07 PM
Creation date
9/17/2020 6:17:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/21/2020
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
9/17/2020 6:18 PM
Modified:
9/17/2020 6:18 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.A. - Page 2 of 4 <br />ANALYSIS <br />The 2019-2020 Watermain Replacement Project in the Arlington Area will replace water distribution pipes <br />in the area surrounding Arlington Road within the Edgewood Park Neighborhood. <br />This Priority -Two project consists of replacing approximately 3,895 linear feet of deteriorated and under <br />capacity cast iron water pipelines with more durable and larger eight -inch polyvinyl chloride (PVC) pipes <br />along Edgewood Road, Turnsworth Avenue, Woodsworth Avenue, Blandford Boulevard and Whipple <br />Avenue. The project will also transfer approximately 75 water service laterals and two fire hydrants from <br />old undersized mains to existing larger water pipelines. The water service laterals within the project area <br />will also be upgraded to two-inch polyethylene pipes. Four existing fire hydrants will be replaced while <br />two new fire hydrants will be added to the project area. The project will improve system fire flows and <br />water quality in the project areas. <br />Four bids were postmarked by July 29, 2020 and the bid opening was conducted via Zoom on August 5, <br />2020: <br />Bidder <br />(lowest to highest) <br />Total Bid Amount <br />(as bid) <br />Casey Construction, Inc. from Emerald Hills, CA <br />$1,479,195 <br />Cratus, Inc. from San Francisco, CA <br />$1,656,600 <br />Mitchell Engineering from Francisco, CA <br />$1,675,798 <br />Pacific Underground Construction, Inc. from San Jose, CA <br />$1,755,495 <br />Engineer's Estimate <br />$1,750,000 - $2,000,000 <br />The low bid of $1,479,195 submitted by Casey Construction, Inc. is approximately 15% lower than the <br />lower range of the engineer's estimate of $1,750,000 for project construction cost. Based on the bids <br />received, staff believes that the low bid is reasonable, balanced and recommends awarding the contract <br />to Casey Construction, Inc. <br />Construction should begin in October 2020 and conclude within 120 calendar days. Staff will notify all <br />residents and businesses who might be affected by the construction. Additionally, the contractor is <br />obligated to notify area residents and businesses two weeks prior to the start of work on each street <br />and/or two days prior to any interruption of water service. Staff will post signs with project information <br />at the construction sites and post construction updates on the City's website. <br />FISCAL IMPACT <br />Funds for the general work of this project were previously approved and appropriated in the Fiscal Year <br />2019-2020 Division budget as Water Fund Capital Projects — Distribution System Replacement Program <br />which has an available balance of $4,943,585.35 as of June 29, 2020. <br />Page 2 of 3 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />
The URL can be used to link to this page
Your browser does not support the video tag.