My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 Kennedy/Jenks Consultants
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 Kennedy/Jenks Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2008 12:33:06 PM
Creation date
3/10/2008 1:09:34 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy Jenks Consultants
PROJECT NAME
Redwood Shores Sewer Pump Station #12
RMP File Number
304
Date
3/5/2008
MO Ref
MO 08-026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT A I. 'f <br /> <br />EXHIBIT "A" <br />SCOPE OF SERVICES <br />(18 January 2008) <br /> <br />CITY OF REDWOOD CITY REDWOOD SHORES SANITARY SEWER PUMP STATION <br />(PS) #12 IMPROVEMENT DESIGN <br /> <br />PROJECT DESCRIPTION <br /> <br />Redwood Shores PS #12 is in need of major rehabilitation. Redwood City has identified <br />the following major elements of construction: <br /> <br />· Conversion of the existing wet~pit dry pit pump station to a wet-pit pump station <br />utilizing submersible pumps <br />· Construction of a new valve vault outside of the wet well <br />· Replacement of the existing pumps with larger pumps to handle the design <br />ultimate flow <br />. Installation of a new standby generator <br /> <br />The Consultant's Scope of Services for this Project is described in the following tasks: <br /> <br />. Task 1: Preliminary Design <br />. Task 2: Contract Documents <br />. Task 3: Bidding Assistance <br />· Task 4: Construction Review <br />· Task 5: Project Management, QAlQC, and Client Meetings <br /> <br />TASK 1: PRELIMINARY DESIGN <br /> <br />In this task we will prepare a draft and final Technical Memorandum. The Technical <br />Memorandum will include the following: <br /> <br />· The development of a system curve to be used in selecting the properly sized <br />pumps. Ultimate design flow information is to be provided by Redwood City. <br />· A review of the existing force main plans to determine if there are any high spots <br />that might exist where high sulfide corrosion of the A.C. pipe might occur. No <br />condition assessment or internal inspection of the force main is proposed. <br />· A meeting with maintenance and engineering staff to determine features that <br />staff wants to see considered in the final design. This would be done as part of <br />the scheduled kick-off meeting. Specific design and equipment requirements will <br />be identified by the City at this time. <br />· A meeting with PG&E to determine if any electrical service upgrade is required <br />and assistance in acquiring any new permits. <br />· A review from the surface of the condition of the concrete surfaces of the wetwell. <br />No confined space entry into the wetwell is proposed. <br /> <br />C:lIloeument. ond Sol\i'lgs~lon\locol Sollilgs\Temporary Inlernot Ros\OLKA2IRevise<CScopoOlServicos_1.16-oll.doc <br /> <br />1 of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.