Laserfiche WebLink
<br />· Provide the Consultant with an AutoCAD file of survey drawings, an existing site <br />plan, existing pump station plan and section sheets, and work-in-progress pump <br />station mechanical sheets prior to the Consultant initiating their design. <br />· Provide the Consultant with a Microsoft Word file of the City.s front-end <br />specifications <br />· Locate all utilities and show them on the site plans <br />· Be responsible fro all surveying and geotechnical activities <br />· Be responsible for all environmental permitting and compliance <br />· Manage the bid process and distribute Contract Documents and Addenda as <br />prepared by the Consultant <br />· Manage the construction process <br />· Prepare all project close out documentation <br />· Prepare Record Drawings <br /> <br />60f6 <br />