My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-03-24 Clsd and Reg
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-03-24 Clsd and Reg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 3:21:37 PM
Creation date
3/20/2008 3:32:55 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/24/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1C <br />Page 18 <br /> <br />11.__ City of Redwood City <br /> <br />preparing for and assisting the City in leading thescopmg meetin~ MHA I RMt will <br />prepare aPowerPoint presentation for use during the meeting. It is anticipated that <br />the presentation will: <br /> <br />· Describe the key elements of the proposed project <br /> <br />· Address the requirements for and content of the EIR <br /> <br />.iI Present the basic elements of the CEQA prOet;!sS <br /> <br />· Identify the probable areas of environmental concern based on data <br />reviewed during Elements 1.1 and 1.3 <br /> <br />· Identify opportunities to comment on the scope and content of the EIR <br /> <br />MHA I RMT will prepare asummary of comments received during the scoping <br />meetin~ as well as those received during the NOP review period. <br /> <br />Element 2: Administrative DraftEIR <br /> <br />MHA [RMT will prepare an Administrative 'Oraft EIR for review and comment by City <br />staff. The Administrative DraftEIR will be prepared in accordance with all applicable <br />provisions of CEQA, and will be submitted to City staff for review and comment prior <br />to preparation and circulation of the Oraft ElR. <br /> <br />Based on MHA IRMT' s current understanding of the proposed project, MHA I RMT has <br />identified 11 parameters that are expected to be key elements of the EIR. The parameters <br />include: <br /> <br />Aesthetics <br /> <br />Air Quality <br />Biological Resources <br />Cultural Resources <br />Geology, Soils, and Seismicity <br />Hydrology and Water Quality <br />tand Use and Planning <br />Noise <br />Public Services <br />Traffic and Transportation <br />Utilities <br /> <br />January n, 2008 <br />RMT <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.