My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-03-24 Clsd and Reg
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-03-24 Clsd and Reg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 3:21:37 PM
Creation date
3/20/2008 3:32:55 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/24/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1C <br />Page 17 <br /> <br />1111111 City of Redwood City <br /> <br />from the applicant, the City of Redwood City's General Plan and Zoning Ordinance, <br />and other reports and studies commissioned by the applicant or the City that may <br />have relevante to the proposed project. The purpose of the review will be to <br />develop a complete and thorough understandirig of the proposed project,the <br />potential impacts of the individual andcollecti.ve project elements, and the existing <br />data sets available for use duringp:reparation of theEIR. <br /> <br />MHAI RMT will also conduct a site reconnaissance of the project site and project <br />area as a part of Element 1.1. <br /> <br />Element 1.2. Define the Proj ect and Prepare the Proj;ect Description: MHA I RMT <br />will, based on review of pertinent documents and discussions with Otystaff, define <br />the project within the context of CEQA for use in the IS, Notice of Preparation <br />(NOP),and ErR. The project description will, at a minimum, include the <br />identification of the purpose and need for the proposed project, detailed <br />descriptions and maps (as appropriate) of each of the projectelements,and.a list of <br />permits required to implement the project (including permits required from other <br />agencies). The project description will be submitted to Oty staff in draft form for <br />review and comment, followed by l'efinement as warranted.. <br /> <br />Element 1.3. Prepare Administrative Draft InitialSwdy: Ml:IA IRMT will prepare <br />an Administrative Draft IS based on the CEQA CheckliSt (Appendix Gof the CEQA <br />Guidelines). The purpose of the Administrative Praft IS, and the 15 (Element 1.4), <br />will be to refine and focus the environmental parameters to be addressed in the Em <br />to those that may have significant effects from implementation of the proposed <br />project. In so doing, the scope of the Em may be focused only on those specific <br />environmental paraItleters likely to be affected by the proposed project. The <br />Administrative DraftIS will he submitted to City staff for review and comment <br /> <br />Element 1.4. Prepar.e Initial Study and Noticeoipreparation: MHAI RMT will <br />prepare an IS based on the City's comments on the Administrative Draft IS (Element <br />1.3). MHA I RMT will prepare a Notice of Preparation (NOP) formstribution by <br />MHAI RMT, with an address list to be supplied by the City. The Notice will be <br />prepared in accordance with CEQA. Distribution of the Notice is anticipated to <br />occur atleast three weeks prior to the Scoping Meeting (Element 1.5). <br /> <br />Element 1.5. Prepare for and Conduct a ScopingMeeting: MHAI ~ will, in <br />consultation with City .staff, prepare for and assist the Otyin leading a scoping <br />meeting during a regularly scheduled meeting of the Planning Commission, City <br />Council, ot other forum accotding to the City' s established protocol. The purpose of <br />thescoping meeting will be to inform the community about the proposed project, to <br />identify the environmental review proq:!ss required by CEQA, to outline the <br />preliminary listof issues to be considered through the process (as identified in the <br />IS), and to solicit comments on the scope oftheEIR' s analyses. In addition to <br /> <br />January 11, 2008 <br />RMT <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.