Laserfiche WebLink
<br />.11. City of Redwood City <br /> <br />Land Use and Planning <br /> <br />The EIR will address the project' s compatibility with the City' sGeneral Plan, Zoning <br />Ordinance, and any other planning or policy documents that relate to development of <br />the subject property.' The EIR will also address the project's compatibility with the <br />surrounding single-family residential development. <br /> <br />Noise <br />. MHAI RMT will be assisted by Ulingworth & Rodkin in assessing the potential noise <br />impacts of the project. The analysis in theEIR will quantify eXIsting noise levels, <br />cakulate future noise levels (particularly :constructioll noise and additionaltratfic noise <br />generated by the new residences), assess projef:t noise impacts, and address any <br />mitigation measures that could reduce the noise impacts of the project. <br /> <br />Public Services <br />The E.IR will include an analysis of whether local police, fire, and other emergency <br />services have the capacity to serve the 18 proposed residences at the project site, and <br />whe.therthe proposed roadway will provide adeqUate access for these services. <br />MHA I RMT will also analyze the capacity of the local school system to absorb the <br />demand likely to be created by the addition of l8 new residences on this site. <br /> <br />Traffic and Transportation <br /> <br />The proposed residential development would add additional traffie trips to the existing <br />cu:1~de-sac, and could result in adverse traffic impacts in the area. MHA I RMT wiIIbe <br />assisted by OmniMeans, a transportation consulti.ng firm, in determining the amount of <br />traffic that would be generated by the development, the impacts oHhis new traffic on <br />roadway .segmentsand intersections, traffic safety issues such as vehicle and pedestrian <br />. visibility along Laurel WaYJ emergency vehicle access, and the project parking design <br />and adequacy. Where appropriate and possible/the Em. will include mitigation <br />measures that could reduce the project impacts on traffic and transportation toa less <br />than sigiUficant level. <br /> <br />Utilities <br /> <br />MHAIRMT underf3tands that no utilities currently serve the project area. MBA I RMT <br />will investigate the specific infrastructure improvements that would be required to <br />provide water, wastewater, electricity, trash and recycling collection.. and other utility <br />services to the site, and whether the utility companies that supply these services have <br />the capacity to serve the project site. <br /> <br />Element2.t.Prepare Administrative Draft Em: The Administrative Draft EIR will <br />include: <br /> <br />January ll, 2008 <br />RMT <br /> <br />6.1C <br />Page 21 <br /> <br />13 <br />