Laserfiche WebLink
6.1. - Page 1 of 10 <br />/<;i-ik <br />Redwood <br />CitylCallifornia <br />wended 1967 <br />*A/ <br />DATE: October 12, 2020 <br />SUBJECT <br />STAFF REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br />Final acceptance of Winslow Street, Bradford Street, and Allerton Street Pedestrian Enhancements Project <br />RECOMMENDATION <br />By motion, accept the Winslow Street, Bradford Street, and Allerton Street Pedestrian Enhancements <br />Project, authorize the release of bonds and retention according to City procedures. <br />STRATEGIC PLAN GUIDING PRINCIPLE <br />Public Safety <br />BACKGROUND <br />On March 23, 2020, the City Council awarded the construction contract for the Winslow Street, Bradford <br />Street, and Allerton Street Pedestrian Enhancements Project to GradeTech, Inc. for their low bid of <br />$324,440.00. <br />The project completed the following improvements: <br />• Demolition and removal of existing pavement <br />• Clearing and grubbing <br />• Concrete curb, gutter, sidewalk, curb ramps, bulb outs <br />• Storm drain inlets, manholes, reinforced concrete pipes, and other drainage modifications <br />• Excavation, backfill, and compaction <br />• Asphalt grinding and overlay <br />• Pavement delineation and roadway markings <br />Page 1 of 3 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcitV.org <br />71 <br />