My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt20 EKI Environment & Water, Inc. 2020 Urban Water Management Plan
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2020
>
Agmt20 EKI Environment & Water, Inc. 2020 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 12:56:34 PM
Creation date
10/22/2020 12:11:34 PM
Metadata
Fields
Template:
Agreement
Contractor Name
EKI Environment & Water, Inc.
PROJECT NAME
2020 Urban Water Mamagement Plan (UWMP)
RMP File Number
304
Date
10/20/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Consultant will summarize the regulatory requirements for permitting and construction of <br />a new groundwater well, including water quality testing requirements, Drinking Water <br />Source Assessment and Protection Program requirements, and design considerations, <br />including treatment requirements (i.e., for iron and manganese, with potential blending to <br />reduce TDS). <br />Consultant will develop an anticipated timeline for well design, construction and <br />permitting, as well as conceptual construction and operational costs for a groundwater <br />well. A qualitative discussion of treatment requirement and costs will also be included <br />(i.e., conceptual -level construction and operational costs estimates for groundwater well <br />treatment). <br />Subtask 2.5 Prepare Draft and Final Technical Memorandum <br />Consultant will develop a brief summary technical memorandum (TM) to summarize the <br />results of Subtasks 2.1 through 2.4 (i.e., potential groundwater yield and costs and <br />process to install a well). The draft TM will be provided to City staff for review and <br />comment. Consultant will be available for one meeting with City staff to discuss draft <br />findings. Upon receipt of comments, Consultant will finalize the TM. <br />Task 2 Deliverable: <br />■ Draft and Final TM - Groundwater Supply Feasibility Assessment <br />Task 3 — Prepare for and Attend Workshop #1 — Projected Water Demands <br />Task 3 includes preparing information regarding water system demand projections and <br />summarizing the key results for presentation to City staff in a working meeting. <br />Subtask 3.1 Water System Description <br />Based on information provided or approved by the City, the characteristics of City's water <br />service area including the water system, average rainfall, average temperature, <br />demographics, water use sectors, and service area will be updated. Consultant can <br />largely build from the information and format included in the 2015 UWMP work effort. <br />Subtask 3.2 Current and Future Population Estimates <br />The 2020 UWMP will document current and future population estimates for the City <br />Service Area (CWC §10631(a)). Consultant will rely on information provided by the City, <br />the 2010 Census data, California Department of Finance data, and/or DWR's population <br />tool to estimate current population. <br />For future population and employment projections, Consultant will work with City staff to <br />review projections incorporated in the DSS Model and assess whether they accurately <br />reflect the City's most recent planning documents and information (e.g.; water supply <br />REV: 10-14-2020 MI <br />ATTY/AGR.2020.240/EKI Environment & Water, Inc. (Page 14 of 21) <br />
The URL can be used to link to this page
Your browser does not support the video tag.