Laserfiche WebLink
10/26/2020 <br />EXHIBIT A <br />CITY OF REDWOOD CITY <br />Community Facilities District No. 2020-1 <br />(Seaport Centre/Seaport Plaza) <br />DESCRIPTION OF FACILITIES TO BE FINANCED BY THE CFD <br />FACILITIES <br />Special taxes collected in the CFD may finance, in whole or in part, the following <br />facilities: <br />1. Design, acquisition and construction of a levee and related flood protection facilities along <br />the perimeter of Seaport Plaza facing Redwood Creek <br />2. Design, acquisition, improvement and replacement of levee improvements and flood <br />protection facilities benefiting Seaport Centre <br />The facilities to be financed shall include all hard and soft costs associated with the facilities, <br />including the costs of the acquisition of land and rights-of-way, the costs of design, engineering <br />and planning, the costs of any environmental or traffic studies, surveys or other reports, costs <br />associated with civil and geotechnical engineering certifications, improvement staking, erosion <br />control, hydroseed, soils testing, encroachment expenses, permits, plan check, and inspection <br />fees, insurance, legal and related overhead costs, coordination and supervision and any other <br />costs or appurtenances related to any of the foregoing as further defined in one or more <br />acquisition agreements with the developer of the property in the CFD. <br />SERVICES <br />Special taxes collected in the CFD may finance, in whole or in part, the following services <br />("services" shall have the meaning given that term in the CFD Law): <br />Operation and maintenance of all of the public improvements and appurtenant facilities described <br />below, but not including any such public improvements and appurtenances that are located in <br />public streets or streets dedicated to the public: <br />• Levees. Any and all levees for the protection of Seaport Centre and Seaport Plaza <br />from inundation, any and all retaining walls, and any and all outboard rock slope <br />protection facilities necessary for erosion control together with any and all <br />appurtenances to any of the above now existing or hereafter to be constructed in <br />or for Seaport Centre or Seaport Plaza. <br />• <br />Storm Drain Systems Improvements. Any and all surface and subsurface storm <br />drainage facilities, including, but not limited to, storm drain pump stations, storm <br />drain mains, manholes with manhole frames and covers, and inlets and catch <br />basins together with any and all appurtenances to any of the above now existing <br />or hereafter to be constructed in or for Seaport Centre. <br />ATTY/RES0.0121/CC RESO REDWOOD CITY ROI ESTABLISH <br />REV: 11-02-2020 MI <br />Page 5 of 22 <br />RESO. NO. 15901 <br />MUFF NO. 506 <br />