Laserfiche WebLink
6.13. - Page 27 of 39 <br />!( � KennedyJenks <br />based on the flow scenarios defined in Task 1.2. Potential places to store or discharge displaced water <br />will be qualitatively discussed based on the volume and timing of flows. An evaluation of specific storage <br />or discharge locations (e.g. facility expansions, costs, approvals) will not be performed as part of this task. <br />Other potential users of purified water will be identified based on discussions with the PREP parties. but <br />evaluation of these options (e.g. conveyance, costs, approvals) will not be performed as part of this task. <br />Assumptions: SFPUC will lead this task, and develop a TM describing RWS considerations related to the <br />addition of purified water to CSR. KJ effort associated with this task is limited to coordination with SFPUC, <br />including a handoff of the ROM and TM to provide input to SFPUC's analysis of RWS considerations. <br />Deliverable: SFPUC to develop TM #2 describing RWS considerations, assumptions and outcomes of the <br />evaluation with summary tables, maps and graphs. SFPUC to provide a Draft and Final TM #2 for <br />inclusion as an appendix to the Phase 3 Study (Task 3). <br />1.7 RWA Implementation Considerations <br />Building on the Phase 2 work, and supplemented by the outcomes from the tasks above, an overview of <br />the RWA alternatives will be developed including: <br />(1) Maps showing major facilities and conveyance options (based on Phase 2 work), <br />(2) Summary of costs from Phase 2 work, updated as appropriate <br />(3) RWA alternative ranking based on decision metrics in Task 1.1. <br />A potential implementation timeline will be developed as part of Task 3.1. <br />Assumptions: Cost spreadsheets from Phase 2 will be used and updated only as needed. Conveyance <br />alternatives from Phase 2 will not be modified, nor will a preferred alignment be selected. AWP <br />assumptions from Phase 2 will apply; additional siting studies and facility layouts will not be performed as <br />part of this work. Ranking will be performed for the 7 sub -alternatives that costs were developed for in <br />Phase 2, updated to reflect outcomes from Tasks 1.2 to 1.6, and applying the qualitative and quantitative <br />metrics developed as part of Task 1.1. RWA analysis progress and results will be presented at Webinars <br />#2, #3 and #4. <br />Deliverable: Alternative maps, summary cost tables for the 7 RWA Alternatives and ranking outcomes, <br />which will be incorporated into the Phase 3 Study in (Task 3). <br />Task 2: Direct Potable Reuse (DPR) Analysis <br />2.1 Develop Conceptual DPR Alternatives <br />Conceptual DPR Alternatives will be developed to reflect the following concepts: <br />(1) Raw Water Augmentation (RaWA) at Bear Gulch Reservoir (6 mgd only), utilizing the existing <br />6 mgd seasonal water treatment plant year-round to treat and deliver drinking water. <br />(2) Treated Water Augmentation (TWA) at 1 location near San Mateo WWTP (6 mgd) to deliver <br />purified water to a local point of connection to the drinking water distribution system. <br />Page 5 <br />49 <br />ATTY/AGR.2020.216/MOA- SVCW, SFPUC, BAWSCA, Cal -Water, City of San Mateo (Page 24 of 36) <br />