My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-11-09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-11-09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 8:53:43 AM
Creation date
11/5/2020 6:29:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
11/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
883
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Lindy Chan, Principal Planner <br />City of Redwood City, Planning Services <br />August 9, 2019 <br />Page 2 <br />contends that the limited scope of the City's proposed EIR is inappropriate, and submits these <br />comments in order to preserve its concerns regarding the proposed scope and content of the <br />proposed EIR. <br />Below are specific scoping requests for the EIR, which the City must address in the EIR to <br />evaluate adequately the potential environmental impacts of the Project on the District. <br />Transportation/Circulation/Traffic Analysis <br />1. Describe the existing and the anticipated vehicular traffic and student <br />pedestrian movement patterns to and from school sites, including <br />consideration of bus routes. <br />2. Assess the impact(s) of increased vehicular movement and volumes, including <br />potential conflicts with school pedestrian movement, school transportation, <br />and busing activities. <br />3. Estimate travel demand and trip generation, trip distribution and trip <br />assignment by including consideration of school sites and home -to -school <br />travel. <br />4. Assess cumulative impacts on schools and the community in general resulting <br />from increased vehicular movement and volumes expected from additional <br />development already approved or pending. <br />5. Discuss the direct, indirect, and cumulative impacts on the circulation and <br />traffic patterns in the community as a result of traffic generated by the <br />transportation needs of students to and from the Project and schools <br />throughout the District during the Project build -out. <br />6. Assess the impacts on the routes and safety of students traveling to school by <br />vehicle, bus, walking, and bicycles. <br />The District has significant concerns about the traffic, transportation, and circulation impacts that <br />the Project may have on the District, including the District's staff, parents, and students that <br />attend Sequoia High School. The foregoing categories of information are critical for determining <br />the extent of those impacts on the District. <br />Any environmental analysis related to the proposed Project must address potential effects related <br />to traffic, noise, air quality, and any other issues affecting schools. (Pub. Resources Code, §§ <br />21000, et seq.; Cal. Code Regs., tit. 14, §§ 15000, et seq.; Chawanakee Unified School District V. <br />County of Madera, et al., (2011) 196 Cal.App.4th 1016.) Additionally, specifically related to <br />traffic, there must also be an analysis of safety issues related to traffic impacts, such as reduced <br />pedestrian safety, particularly as to students walking or bicycling to and from Sequoia High <br />School; potentially reduced response times for emergency services and first responders traveling <br />to Sequoia High School; and increased potential for accidents due to gridlock during school <br />
The URL can be used to link to this page
Your browser does not support the video tag.