My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-11-09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-11-09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 8:53:43 AM
Creation date
11/5/2020 6:29:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
11/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
883
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Lindy Chan, Principal Planner <br />City of Redwood City, Planning Services <br />August 9, 2019 <br />Page 3 <br />drop-off and pick up hours. (See, Journal of Planning Education and Research, "Planning for <br />Safe Schools: Impacts of School Siting and Surrounding Environments on Traffic Safety," <br />November 2015, Chia -Yuan Yu and Xuemei Zhu, pg. 8 [Study of traffic accidents near Austin, <br />Texas schools found that "[a] higher percentage of commercial uses was associated with more <br />motorist and pedestrian crashes" around schools].) <br />As discussed, the District's Sequoia High School is located just northwest of the Project's site. <br />The Project site's neighborhood, which is located on the periphery of the City's downtown core, <br />is one of the most heavily traversed areas in Redwood City. According to the City's General <br />Plan, El Camino Real (State Route 82), off of which both the Sequoia High School and the <br />Project sites are located, is one of the few major boulevards in the City, and serves as a regional <br />route connecting San Jose and San Francisco.' El Camino Real already suffers from substantial <br />vehicular congestion, which produces noise, exhaust fumes, and pollution.2 Further, a trend <br />currently exists where commuters along El Camino Real seek less -congested travel paths in the <br />residential neighborhoods to the north and south of the boulevard, resulting in speeding and <br />dangerous traffic conditions in those neighborhoods, including those residential neighborhoods <br />surrounding the Sequoia High School.3 Acknowledging these issues, the City's General Plan <br />provides that El Camino Real "will be updated to facilitate walkable linkages between Sequoia <br />High School, the transportation center at the Caltrain Station, and Downtown Redwood City."4 <br />The Project site is also located in an area that has experienced a drastic impact in traffic over the <br />last ten to fifteen years as the City has continued to approve of newer commercial, office, and <br />residential land uses. Adding to the District's concerns regarding traffic surrounding the Project <br />site and the Sequoia High School are the number of development projects that have recently been <br />approved by the City and/or completed in the area, including the 1305 El Camino Real project <br />(137 multi -family residential units); the 1548 Maple Street project (131 three-story townhome <br />residential units); the Broadway Plaza project (mixed-use project consisting of approximately <br />520 residential units, 420,000 sf of office space; and 26,000 sf of retail space). There are several <br />other projects that are being considered by the City, including the 150 Charter Street project (72 <br />residential units), and the 1125 Arguello Street project (68 townhomes), all of which promise to <br />drastically increase traffic in the neighborhood and District. Given the magnitude of <br />development being considered and approved in this area, the District maintains that the <br />limited EIR being proposed by the City is inappropriate and in conflict with the letter and <br />spirit of CEQA. <br />The existing congestion of the Project site's neighborhood, combined with all of the various <br />projects located within the vicinity of the Sequoia High School, threaten to have significant <br />impacts, both individually and cumulatively, on the students attending the High School, as well <br />I Redwood City General Plan (October 11, 2010), p. BE -25 <br />2 Id. at Figure BE -14; pp. BE -106 and BE -131. <br />3 Id. at p. BE -134. <br />'Redwood City General Plan (October 11, 2010), p. BE -25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.