Laserfiche WebLink
Ms. Lindy Chan, Principal Planner <br />City of Redwood City, Planning Services <br />August 9, 2019 <br />Page 4 <br />as District staff. Per the Initial Study, the proposed Project would cause the traffic volumes at <br />the Project's site to increase by 630 vehicles and 535 vehicles during the AM and PM peak <br />hours, respectively. It is anticipated that the Project will draw hundreds of additional office <br />workers and residents to the area. This substantial influx of new vehicles and residents will <br />severely exacerbate the already stifling traffic in the neighborhood and the safety issues posed <br />thereby, including by further diverting traffic away from El Camino Real and into the residential <br />neighborhoods surrounding Sequoia High School. The increase in traffic and residents will also <br />severely impact the safety and convenience of Sequoia High School students who walk or bike to <br />school, thus undermining both the City's and the District's policies to facilitate and encourage <br />alternative modes of student transportation. <br />We urge the City thoroughly to address and analyze each of the above listed items through its <br />EIR, and implement extensive and thoughtful mitigation measures. <br />Noise <br />7. Identify any noise sources and volumes which may affect school facilities, <br />classrooms and outdoor school areas. <br />While it is not discussed in the Initial Study, it is expected that noise from construction and <br />operation of the Project will cause impacts on the District's educational program at Sequoia High <br />School. Request No. 7 is intended to clarify that the EIR's consideration of noise issues take into <br />account all of the various ways in which noise may impact schools, including increases in noise <br />levels in the immediate vicinity of Sequoia High School. <br />Population <br />8. Describe historical, current, and future population projections for the <br />District. <br />The District anticipates that this project will generate students and specifically requests that <br />historical, current, and future population projections for the District be addressed in the EIR. <br />Population growth or shrinkage is a primary consideration in determining the impact that <br />development may have on a school district, as a booming population can directly impact the <br />District and its provision of educational services, largely because of resulting school <br />overcrowding, while a district with declining enrollment may depend on new development to <br />avoid school closure or program cuts. Overcrowding can constitute a significant impact within <br />the meaning of the California Environmental Quality Act ("CEQA"). (See, Cal.Code Regs., <br />tit. 14, §§ 15064(e).) This is particularly true where the overcrowding results in unsafe <br />conditions, decreased quality of education, the need for new bus routes, and a need for new <br />school construction. The same can hold true for potential school closures or program cuts <br />resulting from a declining population. <br />