Laserfiche WebLink
Ms. Lindy Chan, Principal Planner <br />City of Redwood City, Planning Services <br />August 9, 2019 <br />Page 7 <br />Relative to Request 14, the Draft EIR should also address the location of current planned school <br />sites in all affected school districts, both to determine the adequacy of the space existing or <br />available for school facilities and also to address traffic, student safety and related impacts <br />affected by a school's location. <br />The population elements addressed in Request 16 are essential because the ultimate impact of <br />growth can best be determined by comparing existing student enrollment, expected future <br />enrollment, and total school capacity. <br />Request 17 is a necessary consideration because certain school facilities may have been <br />designated for particular community uses, or otherwise be unavailable for full classroom service, <br />meaning that they cannot be considered in determining the District's total capacity. Also, some <br />classrooms are dedicated as labs, meaning that they cannot hold the full compliment of students <br />that would occupy a traditional classroom, again affecting a school's total capacity. <br />Requests 18 and 19 are included because they are relevant to the social impacts which may stem <br />from the Project. Again, such impacts are relevant to the extent they are caused by or result from <br />physical impacts, which would include growth. (Pub. Res. Code § 21001(g); Cal.Code Regs., <br />tit. 14, §§ 15021(b), 15131(a) -(c), 15142 & 15382.) If classrooms become overcrowded, or <br />certain programs cannot be offered because of overwhelming student demand, the community's <br />educational services are harmed, a clear social impact. Further, overcrowded classrooms create <br />additional safety concerns, both for students and teachers. <br />Requests 20 through 24 deal with fiscal impacts on the District. The most immediate means of <br />determining whether school overcrowding will occur is to determine first whether the District <br />has adequate available capacity, and second, if not, whether it has adequate sources of funding <br />available to construct new facilities or expand existing ones. This requires consideration of how <br />much it costs to house each student, and how much of that amount can be covered by existing <br />funding sources. To the extent that the existing sources prove insufficient, the difference is an <br />unmitigated impact on the District. <br />Finally, Request 25 again seeks to ensure that a cumulative impact analysis is conducted, as there <br />has been significant development approved and projected within the District's borders. <br />Conclusion <br />The District is not anti -development. However, the needs of the District must be appropriately <br />considered in the environmental review process for all proposed new development that will <br />impact the District, such as the Project. The District is hopeful that it will be able to collaborate <br />with the Developer and the City in order to identify and propose solutions that alleviate the <br />impacts caused by Developer's Project, and is prepared to provide any information necessary to <br />assist the City in preparation of the EIR and in addressing each of the comment and <br />scope/content issues set forth above. <br />