My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-11-09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-11-09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 8:53:43 AM
Creation date
11/5/2020 6:29:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
11/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
883
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Lindy Chan, Principal Planner <br />City of Redwood City, Planning Services <br />February 28, 2020 <br />Page 3 <br />From a practical standpoint, the amount of developer fees received by school districts typically <br />fall woefully short of alleviating the impacts caused by development. This is due largely to the <br />facts that: (1) statutory developer fee amounts fail to acknowledge the differences in costs of <br />school construction from one district to another, which particularly burdens school districts in the <br />bay area; (2) the developer fee amounts fail to contemplate the special facilities needs of those <br />districts experiencing rapid growth, such as the need for portables; and (3) the adjustment <br />formula for developer fees is based on a "construction cost index" and does not include indexing <br />related to the increases in land costs, resulting in the actual costs of facilities (i.e., land and <br />improvements) increasing at a greater rate than the adjustment. <br />The inadequacy of developer fees as a source of funding for school facilities has forced school <br />districts to rely increasingly on other sources of funding, primarily including local bond funds <br />and State bond funds administered under the State Facilities Program (SFP). However, these <br />sources of funds can be equally unreliable. The last State school facilities bond fund <br />(Proposition 51) has been exhausted, and it is currently unclear when/whether those school <br />districts that apply for state funding will be able to receive such funding. Local bond funds are <br />also difficult to generate, as local bonds are subject to school district bonding capacity <br />limitations and voter approval. Either way, the funding formula was never intended to require <br />the State and local taxpayers to shoulder a disproportionate portion of the cost of school <br />facilities. <br />Additional changes to the developer fee landscape render the analysis of environmental impacts <br />under the Initial Study inadequate. For one, if Proposition 13, placed on the ballot by California <br />Assembly Bill ("AB") 48, is approved by the California voters at the March 2020 election, each <br />of the three sources of funds discussed above will be significantly altered. Of particular note, <br />and further undermining the contention that developer fees constitute full and adequate <br />mitigation for impacts caused by the Project, AB 48: (1) eliminates school impact fees for <br />multifamily homes within a half mile of a major transit stop; (2) reduces impact fees for all other <br />multifamily homes by 20%; and (3) suspends level 3 school impact fees. Without full payment <br />of school impact fees from the Project and other residential projects in the area, coupled with the <br />extremely high and rising costs of land, the District will be unable to alleviate many of the <br />Project's impacts through the acquisition of land and construction of new school facilities. <br />For the foregoing reasons, the City's reliance upon SB 50 as a panacea to all impacts caused by <br />the Project on the District is inappropriate, and the City must consider each of the following <br />topics in its EIR. <br />Transportation/Circulation/Traffic Analvsis <br />1. Describe the existing and the anticipated vehicular traffic and student <br />pedestrian movement patterns to and from school sites, including movement <br />patterns to and from Sequoia High School, and including consideration of <br />bus routes. <br />2. Assess the impact(s) of increased vehicular movement and volumes caused by <br />the Project, including but not limited to potential conflicts with school <br />
The URL can be used to link to this page
Your browser does not support the video tag.